Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Exploring the Adoption and Challenges of BIM in Swedish Transport Administration Infrastructure project
Jönköping University, Tekniska Högskolan.
Jönköping University, Tekniska Högskolan.
2025 (engelsk)Independent thesis Advanced level (degree of Master (Two Years)), 20 poäng / 30 hpOppgave
Abstract [en]

This study explores the implementation and challenges of Building Information Modeling (BIM) in infrastructure projects within the Swedish Transport Administration (STA). Through a combination of a literature review and semi-structured interviews with ten STA project managers, the research identifies both the benefits and obstacles associated with BIM use. The findings demonstrate that BIM significantly enhances project coordination, improves design quality, supports visualization, and facilitates better planning and decision-making particularly in complex infrastructure projects. Despite these clear advantages, BIM adoption remains inconsistent across STA projects. The results show several key barriers lack of technical knowledge, unclear internal guidelines, resistance to change, and the perception that BIM tools are too complex. Even experienced BIM users expressed uncertainty about how to apply the technology strategically. Rogers’ Diffusion of Innovations theory, shows that study BIM is perceived to offer relative advantages, low compatibility with existing workflows, high perceived complexity, and limited trialability and observability hinder its widespread adoption. To overcome these challenges, the study recommends a systemic approach that includes clearer BIM objectives, targeted training for project managers, simplification of tools, and the sharing of successful case studies. These actions are aligned with Rogers innovation attributes and are essential to realizing BIMs potential within STA. Ultimately, the findings suggest that BIMs technical value is recognized but without strong organizational support and strategic alignment, its broader adoption remains limited.

sted, utgiver, år, opplag, sider
2025.
Emneord [en]
BIM Implementation, Infrastructure project, BIM Challenges, BIM Benefits, Swedish Transport Administration (STA), Project management
HSV kategori
Identifikatorer
URN: urn:nbn:se:hj:diva-69259OAI: oai:DiVA.org:hj-69259DiVA, id: diva2:1981683
Veileder
Examiner
Tilgjengelig fra: 2025-07-28 Laget: 2025-07-05 Sist oppdatert: 2025-10-13bibliografisk kontrollert

Open Access i DiVA

fulltext(425 kB)244 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 425 kBChecksum SHA-512
70daf36ed876567ed43ec518746f8a668dd9d9c9b6f3021bbb7abf8d0e750bae4105be5069538081fb6c3f8f0920e73bcfd874b1f84d54e6ae0b83a8da7f8705
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 247 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 831 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf