System disruptions
We are currently experiencing disruptions on the search portals due to high traffic. We are working to resolve the issue, you may temporarily encounter an error message.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Förbättring av leveransservice inom ett produktionsflöde mellan en intern och en extern operationsenhet – från ett tillverkande företags perspektiv
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
2016 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Improvement of delivery performance in a production flow between an internal and an external operating unit – from a manufacturing company´s perspective (English)
Abstract [en]

Abstract

Purpose – The purpose of the study is to identify the challenges that arise in the production flow of a manufacturing company between an internal and external operating unit and how these challenges can be managed to achieve higher delivery performance in the production flow. The following two questions where formulated in order to fulfil the purpose of the study:

  1. 1.     What challenges arise in a manufacturing company in the production flow between an internal and an external operating unit.  

 

  1. 2.     How can the challenges in a manufacturing company be managed to improve delivery performance in the production flow between an internal and an external operating unit.

Method – To answer the questions of the study and thus fulfil the purpose a case study was conducted at Bufab Lann AB in Värnamo. Observations, interviews and document studies were conducted to obtain empirical data. Empirical data was analysed against the theoretical framework of the study to answer the study questions. 

Findings – Three challenges were identified in a production flow between an internal and external operating unit: Unlevelled internal production flow, lack of supplier collaboration and inadequate information and communication exchange. The challenges interact with each other, where internal problems are reflected and magnified when an external operating unit is included in the processing operation. To manage the identified challenges with regard to delivery performance must initially the internal production flow be levelled and thereafter establish closer relationships with suppliers and improve the exchange of information to suppliers.

Implications – Synchronizing planned production to the end customer’s delivery date can level the internal production flow while also applying FIFO principles to overloaded stations. To establish good supplier collaboration the number of suppliers should be evaluated to simplify and maintain frequent and routinely information and communication exchange. 

Limitations – During the study a single case study was conducted with one analysing unit, which is not optimal to obtain generalizable results. Conducting additional case studies in several manufacturing companies would have increased the study´s external validity and thus strengthened the generalizability. The study´s reliability is limited with regard to the views and opinions of the study´s external operating unit since only one interview was conducted with the external party.     

Keywords – Production flow, delivery performance, supplier collaboration, information exchange. 

Place, publisher, year, edition, pages
2016. , p. 45
Keywords [sv]
Produktionsflöde, Leveransservice, Leverantörssamverkan, Informationsutbyte
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:hj:diva-30302ISRN: JU-JTH-IGA-1-20160025OAI: oai:DiVA.org:hj-30302DiVA, id: diva2:934028
External cooperation
Bufab Lann AB
Subject / course
JTH, Industrial Engineering and Management; JTH, Industrial Engineering and Management
Supervisors
Examiners
Available from: 2016-06-20 Created: 2016-06-07 Last updated: 2016-06-20Bibliographically approved

Open Access in DiVA

fulltext(6454 kB)724 downloads
File information
File name FULLTEXT01.pdfFile size 6454 kBChecksum SHA-512
507d7a5a1be8299dc106f4193cec5ea87e69c2850984713173334da8722587f22e2e1aa593523c9ec84c350e70f3dae39d7b9c23495610d2f52e362f4eecf15d
Type fulltextMimetype application/pdf

By organisation
JTH, Industrial Engineering and Management
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar
Total: 724 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 880 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf