Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Nya Plan- och bygglagen 2010:900, En konsekvensgranskning av ändringarna i planbeskedet och bygglovsprocessen
Jönköping University, School of Engineering, JTH, Civil Engineering.
Jönköping University, School of Engineering, JTH, Civil Engineering.
2014 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
New Planning and Building Act 2010:900, A consequence survey of the changes in the plane clearance and the building permit (English)
Abstract [sv]

Denna rapport handlar om nya Plan- och bygglagen 2010:900 (PBL). Den nya författningen verkställdes 2 maj 2011. Lagändringens syfte var att effektivisera regler och processer rörande samhällsbyggnad. Ändringarna innebär att det numera finns en privat initiativrätt till ett planbesked. För bygglov och byggkontroll har en rad förändringar införts. Idag prövas ett projekt i två skeden, dels i ett lovskede, men också genom ett byggtekniskt skede. Nya moment för bygglovsprocessen är att handläggningstiden för bygglov ska uppgå till max 10 veckor. Den kontrollansvarige ska numera vara certifierad och denne har även utökade arbetsuppgifter. Det finns numera ett startbesked som bestämmer när en byggnation får påbörjas. Ett obligatoriskt arbetsplatsbesök för byggnadsnämnden på byggarbetsplatsen har även införts. 

 

Arbete syftar till att granska effekterna av planbeskedet och bygglovsprocessen. Genom att påvisa effekterna kan en ökad kunskap och förståelse erhållas för framtida studier. Studien är en kvalitativ fallstudie. Informationen i detta arbete vilar på sekundär data från rapporter, handböcker och internet, samt primär data från intervjuer med kommuner i Jönköpings län. Studien är lokal och kan således inte generaliseras eftersom det finns en risk att kommunerna har blivit samstämmiga i sitt utförande pga. den geografiska närheten kommunerna har till varandra.

 

Resultatet visar att effekterna av nya PBL ser likartade ut inom de kommuner som ingår i studien. De olika förutsättningarna för kommunerna har således haft mindre betydelse för resultatet. Lagändringarna har i stor utsträckning uppfyllt sitt syfte med att effektivisera plan- och bygglovsprocessen. Planbeskedet innebär att det råder entydiga beslut, bättre dialog mellan entreprenör och kommun samt att resurser sparas för kommunerna. För bygglov har 10 veckors gräns för bygglovshandläggning effektiviserat bygglovsprocessen tidsmässigt. Startbesked och arbetsplatsbesök har lett till att byggkontrollen skärpts. 

 

Införandet av de s.k. Attefallshusen, mindre åtgärder rörande bygglovsbefrielse, innebär mer arbete för handläggarna pga. att många byggherrar brister med problematiska bygghandlingar. Detta har skapat ineffektivitet. De nya reglerna om kungörelse har även skapat mer administrativt arbete för handläggarna på kommunen vilket leder till en ökad arbetsbelastning.  

De problem som uppstår härstammar därmed nödvändigtvis inte enbart från lagstiftningen utan beror även till viss del på de personer som ska omsätta de nya bestämmelserna i verklighet.   

Abstract [en]

This report is about the new Planning and Building Act 2010: 900 (PBL). The new act became effective on May 2 2011. The legislative changes intended to make the rules and processes concerning environmental building more efficient. According to the new provisions of PBL, there is no a right to private initiative to plan clearance. For building permits and building inspection, a series of changes occurred. Today there is a two stage building control, a building permit stage and a structural engineering control stage. A new provision of the act provides that the processing of building permits shall not exceed a maximum of 10 weeks. In addition, the duty of the control officer has been extended and all control officers must now be certified. The new PBL also includes the right to receive a starting statement that determines when a construction may commence. A mandatory construction site visit by the local housing committee has been introduced.

This report aims to examine the effects of the plan announcement and building permit process. By demonstrating the effects there can be an increase in knowledge and understanding for future studies.

The information in this report comes from both secondary data like reports, manuals, and Internet, as well as primary data from interviews with municipalities in the county of Jönköping, Sweden. The exam is a local survey and isn’t general for the whole country because there is a chance that the close distances between the municipalities can enable information exchange about work methods.

The result of the studies that has been undertaken shows that the effects of the new PBL are similar between municipalities regardless of the different conditions. The changes have greatly served its purpose of streamlining the planning and building permission sector. Plan announcement means that there is a clear decision, better dialogue between the contractor and the municipality and that there are opportunities for saving resources. The 10 week limit for handling building permits has made the building permit process more effective. Starting clearance and construction visit means that the building controls have tightened.

The non-requirement building permit constructions, the Attefallshouses, means more work for administrators because many developers deficiencies with problematic documents. This has created inefficiency. The new rule about broader announcement for the public has also created more administrative work for the administrators at the municipality.

The problems that may arise are not necessarily due to the legislation itself, but also depends on the people who will implement the new provisions of the work.

Place, publisher, year, edition, pages
2014. , 52 p.
Keyword [sv]
Plan- och bygglagen, PBL, Bygglov, Planbesked, Attefallshus
National Category
Civil Engineering Construction Management Building Technologies
Identifiers
URN: urn:nbn:se:hj:diva-29985ISRN: JU-JTH-BTA-1-20160073OAI: oai:DiVA.org:hj-29985DiVA: diva2:930035
Subject / course
JTH, Civil Engineering
Supervisors
Examiners
Available from: 2016-05-26 Created: 2016-05-21 Last updated: 2016-05-26Bibliographically approved

Open Access in DiVA

No full text

By organisation
JTH, Civil Engineering
Civil EngineeringConstruction ManagementBuilding Technologies

Search outside of DiVA

GoogleGoogle Scholar

Total: 33 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf