Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Erfarenhetsåterföring under garantitiden: Hur entreprenadföretag i byggbranschen kan ta tillvara och använda kunskap
Jönköping University, School of Engineering, JTH, Civil Engineering.
2015 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Experience feedback during warranty : How contractors in the construction industry can preserve and use knowledge (English)
Abstract [en]

Purpose: It has been pointed out in studies how quality in the construction industry

should be improved and how the building process has potential to be more efficient.

The industry's project-based approach complicates the experience feedback and one is

faced with new conditions before each project. When there is so much knowledge and

experience in the industry, it should also be possible to make use of it and pass it on in

the company. Can a perceived experience be fed back entirely or does knowledge get

lost on the way? Today there is research on how knowledge management can improve

the business but there is a lack of research on how to take advantage of knowledge

gained during the warranty period. The aim of the report is to identify areas for

improvement in the work with experience feedback. To find the most important

improvement proposals for a construction company in the work experience feedback

during the warranty period.

Method: The report is a qualitative study and selected research methods are literature

studies, case study, interviews, and document analysis.

Findings: The study concludes that there are no procedures for documentation of the

guarantee measures. For the most part construction services are used to fix errors. The

result of that is that the person who carried out the error is not the one who solves it

which risks that knowledge is lost during returning. Digital tools are used to advantage

to document and collect experiences. There is an awareness in the investigated company

that a database with more experience from projects is needed and interviews show that

a need for it exists. The experience can be collected in the database so all of the

employees use it. Meetings prove to be a good method for disseminating experiences.

Implications: The report shows the conclusion that in the present situation there is no

routine or system for experience feedback during the warranty period. The results show

that all warranty measures should be documented. The experience that is assessed as

significant can advantageously be taken up in meetings with the person who possesses the

experience to be sure that no knowledge will be lost on the way. Small actions that are

documented need not be brought up to the same extent, but the information can be used

to detect recurrent errors. The report highlights the importance of experience being not

only documented, it then becomes no experience feedback. The feedback itself is

central to the benefit and improve the quality of the building. Digital tools can serve as

important tools to document and gather experience and should be used on a larger scale.

Limitations: The report is limited by the focus on the housing side in one construction

company. The work doesn’t immerse in the economic factors or specific construction

errors. The interviews are held only with officials and the majority of the interviewees

work in the same district. Document analysis is used to observe the company's

management, but an in-depth analysis of the system are not executed.

Place, publisher, year, edition, pages
2015. , p. 28
Keywords [en]
Knowledge Management
Keywords [sv]
Erfarenhetsåterföring, byggteknik, garantitid
National Category
Construction Management
Identifiers
URN: urn:nbn:se:hj:diva-28329ISRN: JU-JTH-BTA-1-20150041OAI: oai:DiVA.org:hj-28329DiVA, id: diva2:872505
External cooperation
Skanska Sverige AB
Subject / course
JTH, Civil Engineering
Supervisors
Examiners
Available from: 2015-11-20 Created: 2015-11-17 Last updated: 2015-11-20Bibliographically approved

Open Access in DiVA

fulltext(2791 kB)832 downloads
File information
File name FULLTEXT01.pdfFile size 2791 kBChecksum SHA-512
72550d9e566dbe3ca6d77692e6251d8300ec016f324a7fb26e213c3dc0941e0183aa5e60c8760866ce182af8fe481c0ff7b42620db2313c95fd3d590960d92c9
Type fulltextMimetype application/pdf

By organisation
JTH, Civil Engineering
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 833 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 640 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf