Planned maintenance
A system upgrade is planned for 10/12-2024, at 12:00-13:00. During this time DiVA will be unavailable.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Konstruktion av matarsystem
Jönköping University, School of Engineering, JTH, Mechanical Engineering.
Jönköping University, School of Engineering, JTH, Mechanical Engineering.
2015 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Design of feeding system (English)
Abstract [sv]

Syfte – Att skapa ett innovativt system som separerar samt underlättar matning av små detaljer från punkt A till B utan att komplikationer uppstår.

Att skapa ett system som underlättar transport av detaljerna genom en automatiserad mätmaskin för att minimera manuellt arbete som sliter på personalen. Syftet med studien är inte att ta fram en konstruktion som är färdig för produktion. Syftet är att ta fram lösningsförslag på de problem som upplevs med maskinen.

Metod – Arbetet grundar sig i den industriella PU-processen där vissa faser har tagits bort då ingen ny produkt har utvecklats utan endast en vidareutveckling har utförts. Förstudien gjordes i form av ett möte med PEMA Metall. Mötet gick ut på att samla in så mycket information som möjligt för vidare arbete. En kravspecifikation upprättades sedan i samarbete med PEMA Metall. Därefter utfärdades en tidsplanering i form av ett Gantt-schema som baserades på faserna från den använda processen. En idégenerering genomfördes i form av en brainstorming session. Därefter viktades kraven i kravspecifikationen med hjälp av metoden Parvis jämförelse. Första konceptelimineringen utfördes i tre steg, i första steget användes endast magkänsla för att eliminera orealistiska lösningar. I andra steget användes en elimineringsmatris för att få bort de lösningar som inte uppfyllde de givna kraven. I tredje steget upprättades en Pugh-matris för att eliminera de sämsta lösningarna. De kvarvarande lösningarna sammanställdes i en morfologisk matris för att ta fram ett antal totallösningar. Totallösningarna fördes sedan in i en ny Pugh-matris för att ta fram ett vinnande koncept.

Resultat – Arbetet resulterade i ett lösningsförslag på de två delproblemen med mätmaskinen. Delproblemen innefattar separering/inmatning och frammatning.

Skribenterna har tagit fram ett konceptförslag som till stor del löser de problem som PEMA Metall upplever med maskinen. Detta förslag är inte direkt applicerbart på maskinen då inga viktiga mått har tagits i åtanke vid konstruktionsarbetet.

Implikationer – Utvecklingsarbetet har resulterat i en teoretisk effektivitetsökning. Från att maskinen mätte cirka en detalj i sekunden till en teoretisk hastighet på 3.9 per sekund beroende på vald standardkedja.

Begränsningar – Det finns risk att kolven som används vid inmatningen inte kan arbeta så snabbt som den behöver utan att vibrationer uppstår. En lösning på detta problem diskuteras i kapitel 6.3.

Abstract [en]

Purpose – To create an innovative system that separates and facilitates feeding of small details from point A to point B without any complications. To create a system that facilitates transportation of details through an automatic measuring machine to minimize manual labor who wears the staff. The purpose of this study is not to develop a construction which is ready for production. The aim is to develop a proposed solutions to the problems experienced with the machine.

Method – The work is rooted in the industrial PU-process where certain phases have been removed because no new product has been developed, but only a further development have been made. The pilot study was done in the form of a meeting with PEMA Metall. The meeting was to gather as much information as possible for further work. A requirement specification was drawn up in collaboration with PEMA Metall. Subsequently a schedule were issued in the form of a Gantt chart, based on the phases of the process used. An idea generation took place in the form of a brainstorming session. Then the requirements from the specification where weighted against each other by the method Pairwise comparison.

The first concept elimination was carried out in three steps, in the first step only gut feeling was used to eliminate unrealistic solutions. In the second step an elimination matrix was used to eliminate the solutions that did not meet the given requirements. In the third step a Pugh matrix was established to eliminate the worst solutions.

The remaining solutions were transferred into a morphological matrix to produce a number of total solutions. The total solutions were then transferred into a new Pugh matrix to produce a winning concept.

Findings – The work resulted in a proposed solution to the two sub-problems with the measuring machine. The sub-problems comprises separating and feeding.

The authors have developed a concept proposal that largely solves the problems PEMA Metall experiences with the machine. This proposal is not directly applicable to the machine due to that no important measurements has been taken in mind during the design work.

Implications – The development has resulted in an efficiency increase from about one detail per second being measured to the theoretical 3.9 measurements per second depending on the selected chain.

Limitations – There is a risk that the piston used at the input cannot work as fast as it needs without causing vibration. A solution to this problem is discussed in chapter 6.3.

Place, publisher, year, edition, pages
2015. , p. 44
Keywords [sv]
Matarsystem Mätmaskin Maskin Mata Matning Produktutveckling Konstruktion
National Category
Other Mechanical Engineering
Identifiers
URN: urn:nbn:se:hj:diva-27791ISRN: JU-JTH-MTA-1-20150034OAI: oai:DiVA.org:hj-27791DiVA, id: diva2:849269
Subject / course
JTH, Product Development
Supervisors
Examiners
Available from: 2015-12-07 Created: 2015-08-27 Last updated: 2015-12-07Bibliographically approved

Open Access in DiVA

fulltext(3699 kB)1271 downloads
File information
File name FULLTEXT01.pdfFile size 3699 kBChecksum SHA-512
bd0972406e6981e507c6bc578b328da7d57feb2f6fd12dad6bb092f70236f4f59f1a436f28a1911ececd4da10fde4a31900f3825761baff7061eb1f227cabea8
Type fulltextMimetype application/pdf

By organisation
JTH, Mechanical Engineering
Other Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 1282 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 965 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf