Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
En studie över effektiviseringsmöjligheter av fjärrvärmeinstallationer i småhus
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
2014 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
A study of possibilities for increasing efficiency of district heating installation in houses (English)
Abstract [sv]

Syfte: Syftet med examensarbetet är att undersöka möjligheter till effektivisering av fjärrvärmeinstallationer i småhus med hjälp Lean. Detta har gjorts genom att besvara de tre följande frågeställningarna:

  • Hur ser en fjärrvärmeinstallation i småhus ut i dagsläget?
  • Vilka slöserier går att identifiera i processen för fjärrvärmeinstallation i småhus?
  • Hur kan slöserier i processen för fjärrvärmeinstallation i småhus minskas?

Metod: För att uppfylla examensarbetets syfte har en fallstudie genomförts på Jönköping Energi som är en leverantör av fjärrvärme. Där har intervjuer och dokumentationsstudier använts som datainsamlingsmetoder. Litteraturstudier har gjorts för att samla in information kring teorier som sedan använts för att utvärdera och analysera empirin.

Resultat: Genom studien har slöserier identifierats i processen för fjärrvärmeinstallation i småhus. Det största slöseriet som identifierats är väntan som uppstår mellan delprocesserna, vilken uppgår till 20 % av den totala ledtiden för installationen. Genom att införa ett informationssystem som täcker glappet mellan entreprenörerna och fallstudieföretaget, förändrad tidsplanering samt arbete med parallella processer anses denna väntan kunna minskas.

Implikationer: Denna studie visar att med hjälp av Lean kan processen för fjärrvärmeinstallation i småhus effektiviseras och att ledtiden för processen kan förkortas genom eliminering av slöserier. Studien visar också att genom att använda periodlös planering kan ledtiden förkortas ytterligare då tidsplaneringen anpassas efter verksamheten.

Begränsningar: Studien som genomförts baseras på empiri som samlats in på ett fallstudieföretag, genom att öka antalet fallstudier samt genomföra dessa på fler en ett företag ökar generaliserbarheten i resultaten.

Abstract [en]

Purpose: The purpose of this study is to investigate the possibilities for improving the efficiency of district heating installations in houses by using Lean. This is done by answering the following three questions:

  • How is a district heating installation implemented?
  • What types of wastes can be identified in the process of district heating installations in houses?
  • How can wastes in the process of district heating installations in houses be reduced?

Method: In order to fulfill the purpose of the study a case study has been conducted at Jönköping Energi, a supplier of district heating. Interviews and documentation studies have been used as data collection methods. Literature studies have been made to collect information on theories that were used to evaluate and analyze empirical data.

Results: Wastes in the process of district heating in houses has been identified in the study. The biggest identified waste is the wait that occurs between the sub-processes, where wait reach up to 20 % of the total lead time of the installation. By implementing an information system, introducing changes in scheduling and start working in with parallel processes this wait can be reduced.

Implications: This study shows that by using Lean the process of district heating installations in houses can be more efficient and that the lead time for the process can be shortened by eliminating wastes. The study also shows that by using bucketless planning, lead time can be shortened further when scheduling adapts to the process.

Limitations: The study was carried out based on only one case study. By increasing the number of case studies and by carry those out in more than one company the generalizability of the results will be increased.

Place, publisher, year, edition, pages
2014. , p. 60
Keywords [en]
District heating, Lean, Process mapping, Value stream mapping, Waste
Keywords [sv]
Fjärrvärme, Lean, Processkartläggning, Slöseri, Värdeflödeskartläggning
National Category
Transport Systems and Logistics
Identifiers
URN: urn:nbn:se:hj:diva-24003OAI: oai:DiVA.org:hj-24003DiVA, id: diva2:721864
Subject / course
JTH, Industrial Engineering and Management
Supervisors
Examiners
Available from: 2014-06-12 Created: 2014-06-05 Last updated: 2014-06-12Bibliographically approved

Open Access in DiVA

fulltext(1466 kB)423 downloads
File information
File name FULLTEXT01.pdfFile size 1466 kBChecksum SHA-512
e085698f6ede053ea064ed9c27365edc0a4fb2f7ccd74312a76ef7c2024cf38979cd941d5b272ae39016fd44f96b3ae19756bbf8209329757bbfee82c3c9bcde
Type fulltextMimetype application/pdf

By organisation
JTH, Industrial Engineering and Management
Transport Systems and Logistics

Search outside of DiVA

GoogleGoogle Scholar
Total: 423 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 475 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf