Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Effektivisering och produktivitetsökning i produktionsflödet av Hammarhäftare på Isaberg Rapid AB
Jönköping University, School of Engineering, JTH, Mechanical Engineering.
2013 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [en]

Abstract

The market’s demand to purchase more cost effective products is continuously increasing. The producers are forced to become more efficient and flexible with resources to produce high quality products at a low cost in order to maintain or increase market shares. With this in mind Isaberg Rapid AB is requesting a project to increase efficiency in the assembly cell of hammertackers. The company has found in Kaizen-events that there is a potential of efficiency improvements in the assembly group that has not been achieved.

The objective with this paper is to identify the major factors that influence the efficiency in the assembly cell for hammertackers. At the same time the project is to generate data on new operation times, calculate the number of operators required in the cell and to implement standardized work instructions.

The facts and data have been collected by discussions with operators, time studies and by filming the operation. A one week Kaizen-event with the operators was made, where the selected changes were implemented. The result of the changes in terms of efficiency and output were registered.

The following basic questions are answered in the report.

  • What changes are required to increase efficiency?
  • What are the non-conformity reasons that prevent the group from reaching the production targets?
  • Is there a need for a different set up in the cell?

In the Kaizen-event, a number of observations were made in the hammertacker group and the major wastes were identified. The largest wastes were identified to be that materials for packing were too far from the assembly cell, setting times for tool changes were long and that the operators’ workload was not in balance.

 A new layout was made to reduce the distance to packing materials. The height and setting of moulds were changed to get faster mould exchange. Operations were  introduced to the cell to get a better balance of the workload between operators.

The observed interruptions have mainly been due to lack of different raw materials.

There was no reason to modify the way work was carried out in the cell; never the less, some minor adjustments were made. The change with the biggest impact was to remind the operators of the factors that affect the productivity most.

The number of produced products has increased by 21 %, which also gives the corresponding efficiency increase.

The conclusion of this paper is that increased productivity is obtained by identifying and eliminating waste, increasing the participation of the operators and creating a standardized way of working.

Place, publisher, year, edition, pages
2013. , p. 62
National Category
Production Engineering, Human Work Science and Ergonomics
Identifiers
URN: urn:nbn:se:hj:diva-22041OAI: oai:DiVA.org:hj-22041DiVA, id: diva2:651011
Subject / course
JTH, Mechanical Engineering
Supervisors
Examiners
Available from: 2013-09-27 Created: 2013-09-24 Last updated: 2013-09-27Bibliographically approved

Open Access in DiVA

fulltext(1535 kB)433 downloads
File information
File name FULLTEXT01.pdfFile size 1535 kBChecksum SHA-512
ec0dcdbbd168ec48bcf47ebafd87ce3f1d899d55caa45b856c3eaca44e148017becf5746229ef271be912073b8b297bfb1014fade4b15d3f0de1ce9409c23c6e
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Zeybrandt, Peggy
By organisation
JTH, Mechanical Engineering
Production Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar
Total: 433 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 426 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf