System disruptions
We are currently experiencing disruptions on the search portals due to high traffic. We are working to resolve the issue, you may temporarily encounter an error message.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Reducing internal lead times in MTO & job-shop production environments: a case study
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
2013 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

This Master’s thesis has been carried out within the subject area of Production Development and Management and aims to reduce internal lead times in make-to-order (MTO) and job-shop production environments with the use of identified theoretical methods.

The reason this particular production environment was chosen was the flexibility and satisfaction it provides its customers. Today, customers expect customised products, a situation which causes problems for manufacturers as they are unable to produce such products in large amounts. In order to investigate problems with these kinds of environments and the causes for long lead times, we have conducted a literature study where we identified the problems these particular kinds of production environments experience regarding production planning and control which are related to the immense amount of time consumed by changeovers because of high demand variance and high requirements for customisation.

To affirm the theoretical findings, we opted to undertake a case study and chose Talent Plastics Gislaved AB as our case, because this company utilises an MTO and job-shop production environment for its production of highly customised products with high demand variance. In the analysis of our case, we found that the wastes in the organisation were similar to those identified in the theoretical findings. The current planning system and the current state of the manufacturing lead time system were evaluated and a theoretical framework using a combination of lean production, work load control and constant work-in-process theories was suggested. We claim that concentrating on the reduction of setup times can lead the job-shop towards drastically decreased lead times and a much more effective use of time throughout the organisation.

Because the organisation will continue to face problems due to the ever-increasing demand variance and requirements for customisation, there are plenty of opportunities for further research in these kinds of production environments. Emerging theories, such as quick response manufacturing, may also be tested to construct an efficient framework.

Place, publisher, year, edition, pages
2013. , p. 81
Keywords [en]
Job-shop, Make-to-order, internal lead time, changeover time, production planning, planning lead time, manufacturing lead time, work load control, lean production, CONWIP, preventive maintenance.
National Category
Production Engineering, Human Work Science and Ergonomics
Identifiers
URN: urn:nbn:se:hj:diva-20952OAI: oai:DiVA.org:hj-20952DiVA, id: diva2:616515
External cooperation
Talent Plastics Gislaved AB
Subject / course
JTH, Production Systems
Uppsok
Technology
Supervisors
Examiners
Available from: 2013-05-13 Created: 2013-04-17 Last updated: 2013-05-13Bibliographically approved

Open Access in DiVA

fulltext(2960 kB)6281 downloads
File information
File name FULLTEXT01.pdfFile size 2960 kBChecksum SHA-512
b0a00b4f0486920653a240c3e6ecb653d1471319a1da9fbc25686a94391ec4803d3994f4e67b0d524b78066d9cd603a94a764d15555f6014fec89af9fd24a98b
Type fulltextMimetype application/pdf

By organisation
JTH, Industrial Engineering and Management
Production Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar
Total: 6285 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1030 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf