Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
ANALYS OCH FÖRSLAG TILL OMBYGGNAD AV VATTENTORN I SVERIGE
Jönköping University, School of Engineering, JTH, Civil Engineering.
Jönköping University, School of Engineering, JTH, Civil Engineering.
Jönköping University, School of Engineering, JTH, Civil Engineering.
2010 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
ANALYSIS AND PROPOSAL FOR RECONSTRUCTION OF WATER TOWERS IN SWEDEN (English)
Abstract [sv]

Detta examensarbete syftar till att utreda generella problem som uppstår då uttjänta

vattentorn byggs om till bostadshus. Arbetet har utförts med handledning av White

Arkitekter i Örebro, och är indelat i två delar.

I den första delen analyseras fem redan ombyggda vattentorn i Kalmar, Linköping,

Norrköping, Borlänge och Råsunda, med avseende på de generella problemen kring

vertikala kommunikationer, dagsljusproblematik, konstruktion, ursprunglig interiör,

brandsäkerhet, installationer och planlösningar.

Vid sammanställning av dessa analyser drogs bland annat följande slutsatser:

I de flesta fall tas de befintliga kontreforerna bort för att maximalt kunna utnyttja

våningsplanernas yta. I regel ersätts de borttagna kontreforerna med stålpelare

som tar mindre plats.

I referensobjekten har de flesta delarna av den ursprungliga interiören tagits bort

vid ombyggnationen.

Den genomgående vertikala kommunikationen har i fyra av de fem

referensobjekten placerats invändigt på grund av bevarandekraven av exteriör.

Antalet och storleken på fönster skiftar kraftigt mellan de olika tornen och

dagsljusproblematiken beror på hur många fönster som finns innan

ombyggnaden. På grund av bevarandekraven tillåts i de flesta fall inga nya

håltagningaroch då måste problematiken lösas på andra sätt, t.ex. med håltagning

i bjälklag.

I den andra delen används slutsatserna från den första delen för att lösa problem vid

ombyggnation av Gamla vattentornet i Sala. Ett förslag tas fram för flerbostadshusrespektive

enbostadshuslösning. Flerbostadshuset innehåller fem lägenheter med öppna

planlösningar, varav fyra är 2 RoK i etage och den femte är 1 RoK. I etagelägenheterna

löses dagsljusproblematiken genom öppningar i bjälklaget. I enbostadshuset löses

kommunikationen mellan våningarna genom att huset delas in i tre zoner med olika

funktioner. Zonerna delas in med blandade funktioner i botten, sociala delar i mitten och

de privata delarna i toppen av tornet.

Abstract [en]

This thesis aims to investigate the general problems that arise when decommissioned

water towers are converted to residential. The work has been done with the guidance of

White Architects in Örebro, and is divided into two parts.

In the first part five already converted water towers in Kalmar, Linköping,

Norrköping, Borlänge and Råsunda are analyzed, regarding to the general problems of

vertical transportation, daylight problems, construction, original interior, fire safety,

installations and floor plans.

In compiling this analysis, the following conclusions were made:

In most cases the existing columns are removed to gain maximum area for each

floor, and the deleted columns are replaced with steel columns that needs less

space.

In the reference objects, most parts of the original interior has been removed

during the rebuilding.

The continuous vertical communication in four of the five reference objects, are

placed inside the towers, due to conservation requirements of the exterior.

The number and size of windows differs widely between the various towers, and

daylight problem depends on the number of original windows existing before the

renovation. Due to conservation requirements in most cases no new holes are

allowed and therefore the problems have to be solved in other ways, such as with

holes in the slabs.

In the second part the conclusions from the first part are used to solved the

problems regarding the reconstruction of The old water tower in Sala. A proposal has

been made for multi-family dwellings, respectively one-family dwelling. The multi-family

dwelling consist of five apartments with open floor plans. Four of them are two

bedrooms duplex apartments, and one is an one bedroom apartment. The duplex

apartments solves the daylight problem by openings in the slabs. In the one-family

dwelling the communication between floors through the house are dissolved by dividing

the building into three zones with different functions. The zone in the base contains of

mixed functions, the center consist of social elements and the private areas are placed at

the top of the tower.

Place, publisher, year, edition, pages
2010. , p. 80
Keywords [en]
Swedish water towers, Dwellings, Reconstruction, Duplex apartments, Daylight problem
Keywords [sv]
Svenska vattentorn, Bostäder, Ombyggnad, Etagelägenheter, Dagsljusproblematik
National Category
Building Technologies
Identifiers
URN: urn:nbn:se:hj:diva-17208OAI: oai:DiVA.org:hj-17208DiVA, id: diva2:479002
Subject / course
JTH, Civil Engineering
Uppsok
Technology
Supervisors
Examiners
Available from: 2012-03-01 Created: 2012-01-17 Last updated: 2012-03-01Bibliographically approved

Open Access in DiVA

No full text in DiVA

By organisation
JTH, Civil Engineering
Building Technologies

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 183 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf