Analys av interna transporter och buffertlager vid Vest-Wood Sverige AB
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
2007 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 points / 15 hpStudent thesis
Abstract [sv]

Denna rapport är resultatet av en analys som gjorts vid Vest-Woods fabrik i Forserum under våren 2007 i syfte att reducera interna transporter. Vest-Wood AB i Forserum tillverkar dörrar för den svenska marknaden men förser också en annan fabrik (Sdr

Felding i Danmark) i samma koncern med dörrstommar. Materialhantering för att förse Sdr Felding fabriken med dörrstommar medför i dagsläget mycket interna transporter i Forserumsfabriken. För att klara ojämn efterfrågan från Sdr Felding fabriken samt för att kunna jämna ut sin egen produktion har Forserumsfabriken valt

att lagerföra de tolv artiklar som beställs mest frekvent från Sdr Felding fabriken. Buffertlagret vid Forserumsfabriken där artiklarna lagerförs är placerat ca 200 m från produktionen vilket medför mycket intern transport för hantering av dessa. Uppgiften

som Vest-Wood AB i Forserum ville ha analyserad var hur de kunde hitta ett mer ekonomsikt fördelaktigt upplägg av de interna transporterna inom fabriken i Forserum. För att kartlägga nuläget beräknades medelvärdet av buffertlagret baserat på inventerade lagersaldo från 2006. I samma buffertlager lagerförs den buffert som

skall täcka efterfrågan för den veckas extra semester som Forserumsfabriken har jämfört med Sdr Felding fabriken. Den semesterbufferten fick räknas bort. Efter att ha fastställt medelvärdet på buffertlagret kunde lagerhållningskostnaden beräknas.

I den del av Forserumsfabriken som vi analyserat sker tillverkning i tre flöden där de tolv lagerförda dörrstommarna tillverkas i två av dem. Vi räknade ut att total kapacitet i dessa båda och fann att det finns en möjlig extra kapacitet på 25 %. Med medelvärdet och möjlig extra kapacitet som underlag kunde ett förbättringsförslag

tas fram. Förbättringsförslaget handlar om att ta bort buffertlagret, som ett led i att minska de interna transporterna. Förbättringsförslaget förutsätter att samarbetet och insynen mellan fabriken i Sdr Felding och fabriken i Forserum förbättras.

Abstract [en]

This report is the result of an analysis made at Vest-Woods factory in Forserum during the spring of 2007 with the purpose to reduce internal transports. Vest-Wood AB in Forserum produces doors for the Swedish market but is also a supplier of doorframes to another factory (Sdr Felding in Denmark) in the same group of companies. The material handling for supplying the factory in Sdr Felding with

doorframes causes a lot of internal transports. The factory in Forserum has chosen to keep the twelve most ordered doorframes in stock to keep up with varying demand from the factory in Sdr Felding and to smooth their own manufacturing. The warehouse in Forserum, where the doorframes are stored, is placed 200 m from the

manufacturing site and that contributes to the internal transport. The assignment that Vest-Wood AB in Forserum wanted analysed was how they could find a more beneficial arrangement of the internal transports from an economic point of view. To define the present situation we calculated the mean value based on inventory data

from 2006. The factory in Forserum is closed for one more week than the factory in Sdr Felding is during the summer. For that reason, a buffer is built to cover the demand from the factory in Sdr Felding during this week. This buffer is also kept in the warehouse. That buffer was subtracted from the inventory results. When the mean

value of the warehouse had been calculated, the yearly cost of storing the doorframes could be calculated. There are three different flows in that part of the factory in Forserum where our analysis has taken place. Production of the twelve doorframes

takes place in two of them. We calculated total capacity in these two flows and found that they have potential extra capacity of 25 %.

With the mean value of the warehouse and the potential extra capacity in the production we could work out a proposal of improvement. The proposal treats how to remove the warehouse as a way of reducing internal transports. The proposal assumes

that the collaboration and insight between the factory in Sdr Felding and the factory in Forserum is improved.

Place, publisher, year, edition, pages
2007. , p. 48
Keywords [en]
Internal transport, material handling, warehouse, non-value adding activities
Keywords [sv]
Intern transport, materialhantering, lager, icke värdeskapande aktiviteter
National Category
Other Mechanical Engineering
Identifiers
URN: urn:nbn:se:hj:diva-879OAI: oai:DiVA.org:hj-879DiVA, id: diva2:4627
Uppsok
teknik
Supervisors
Examiners
Available from: 2007-07-03 Created: 2007-07-03

Open Access in DiVA

fulltext(487 kB)1207 downloads
File information
File name FULLTEXT01.pdfFile size 487 kBChecksum SHA-1
5775332088793094298ac5b9527157fa2ca1b85bbc9c24831acccce49a028faad5b2fdf8
Type fulltextMimetype application/pdf

By organisation
JTH, Industrial Engineering and Management
Other Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 1207 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1046 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf