Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Kalkylverktyg För Sågklingor
Jönköping University, School of Engineering, JTH, Mechanical Engineering.
Jönköping University, School of Engineering, JTH, Mechanical Engineering.
Jönköping University, School of Engineering, JTH, Mechanical Engineering.
2007 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 points / 15 hpStudent thesis
Abstract [en]

The purpose of this report is to survey Swedex AB’s production costs and to gather all info into a manageable calculation tool. This was made by time and motion studies, interviews of the personnel. All factors were gathered into an Excel chart.

The calculation was made according to an additional-charge-method that was considered to satisfy Swedex AB’s goal. This makes a complete-cost-estimate which is important when the selling price should cover the production costs. The blades were divided into different populations to facilitate the calculation work. The division was made with the production cost in consideration to minimize the risk of losing parameters.

The time and motion study, which is the basis of the calculation, was obtained by the group and gave insight of the saw blade production. Here it was discovered, what was said to be a bottleneck was not the case.

Swedex AB has a great amount of products in labour, this in opposite to the “just in time”-philosophy, but Swedex AB see’s this as a resource. This is seen as a utilization increaser, to keep up the production rate.

Swedex AB has a lot of old machines, but these have to be part of the calculation while they in a near future will be reinvested with new machines. An adjustment has been done to consider purchase price, second hand price and service/repair costs.

Place, publisher, year, edition, pages
2007. , p. 51
Keywords [sv]
Laserskärning, Tandlödning, Tandslipning, Tidmätning, Lager, Produktkalkyl, Kostnadskalkyl, Avskrivning, Excel-fil
National Category
Other Mechanical Engineering
Identifiers
URN: urn:nbn:se:hj:diva-852OAI: oai:DiVA.org:hj-852DiVA, id: diva2:4599
Uppsok
teknik
Supervisors
Examiners
Available from: 2007-06-20 Created: 2007-06-20

Open Access in DiVA

fulltext(517 kB)1891 downloads
File information
File name FULLTEXT01.pdfFile size 517 kBChecksum MD5
e3c9f9a14d099f8da55dd60871341f8b5f3686ea73312aafccdfec84c72612c57a7b975f
Type fulltextMimetype application/pdf

By organisation
JTH, Mechanical Engineering
Other Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 1902 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 788 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf