Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Analys och utvärdering av produktionsupplägg
Jönköping University, School of Engineering, JTH, Mechanical Engineering.
Jönköping University, School of Engineering, JTH, Mechanical Engineering.
2011 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Analysis and evaluation of production layout (English)
Abstract [en]

Toms in Habo moulds jelly candy. The company has a good demand for theirproducts while the factory's machines are in need of an upgrade. Therefore, newmachinery will be purchased and meanwhile there is a vision to change the layoutof the plant. A new arrangement of the plant is necessary because today's disposalof floor space lack conditions to produce large quantities. Toms have developed asuggestion of a new production arrangement, but an evaluation of this is needed.The thesis focuses on evaluating and developing the existing proposal to Toms. Inorder to do so four independent suggestions for a layout of the plant were madewith the method of Systematic Local Planning (SLP). The making of a situationanalysis clarified the conditions required to perform an SLP. The developedsuggestions were valued by a number of criteria. The criteria where establishedfollowing the conditions needed for production. The suggestion given the highestscore in the evaluation was then compared against the suggestion that wasdesigned by Toms. To clarify differences in flows between the various suggestionsarising from the work a spaghetti diagram were drawn for each suggestion.The comparison revealed that both suggestions were similar structured. Theevaluation shows that the suggestion that the thesis presents has a betterutilization of the area and an approach that makes it easier for the staff at thevarious workstations to see each other.Another issue has been how a requested molding machine is to be placed. Givenfrom the beginning have been two options from Toms. Our recommendation is inconsensus with the thesis highest scored suggestion, which means one of theoriginally given options.

Place, publisher, year, edition, pages
2011. , 54 p.
Keyword [sv]
Systematisk Lokalplanläggning, Sockerkonfektyr, Produktionslayout
National Category
Environmental Analysis and Construction Information Technology
Identifiers
URN: urn:nbn:se:hj:diva-15350OAI: oai:DiVA.org:hj-15350DiVA: diva2:422687
Subject / course
JTH, Mechanical Engineering
Uppsok
Technology
Supervisors
Examiners
Available from: 2011-08-02 Created: 2011-06-13 Last updated: 2011-08-02Bibliographically approved

Open Access in DiVA

No full text

Search in DiVA

By author/editor
Andersson, ClasAndersson, Edvard
By organisation
JTH, Mechanical Engineering
Environmental Analysis and Construction Information Technology

Search outside of DiVA

GoogleGoogle Scholar

Total: 328 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf