Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Effektiv partiformning: analys och tillämpning på Uppåkra Mekaniska AB
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
2006 (Swedish)Independent thesis Advanced level (degree of Magister), 20 points / 30 hpStudent thesisAlternative title
Efficient lot-sizing : a case study at Uppåkra Mekaniska AB (English)
Abstract [en]

This paper is the result of a case study conducted at Uppåkra Mekaniska AB during the spring of 2006. The task that was presented by Uppåkra was to develop a basis for a decision for the planning activities at the company, so that in the future they can create lot-sizes which are based upon a total cost perspective. Total cost in regards to lot-sizing is defined as the sum of the administrative reordering costs and warehousing cost per stock keeping unit.

To collect data a series of interviews and observations were conducted. This data was then used during the lot-sizing simulation and analysis. The 15 units that the simulation was conducted on were grouped into three item classes depending how many different machine setups they required during the production process. Class A contained items which resulted in only one machine setup; where as those items in Class B had several different setups. Class C represents items without any machine setups, but requires shorter preparation for assembly. In the simulations the Wilson’s formula, Economic Part Period (EPP) and Least Cost method (LC) were compared with the lot-sizing model currently used by Uppåkra.

The simulation results showed that there is a large potential to reduce the cost of lot-sizing by using the Wilson’s formula instead of the current model. For the 15 units simulated in this study, there was the potential to reduce costs by 5000SEK per unit yearly.

Place, publisher, year, edition, pages
2006. , p. 64
Keywords [sv]
partiformning, orderkvantitet, ekonomisk orderkvantitet, totalkostnad, Uppåkra Mekaniska AB
National Category
Production Engineering, Human Work Science and Ergonomics
Identifiers
URN: urn:nbn:se:hj:diva-502OAI: oai:DiVA.org:hj-502DiVA, id: diva2:4211
Uppsok
teknik
Supervisors
Examiners
Available from: 2006-08-08 Created: 2006-08-08

Open Access in DiVA

fulltext(604 kB)2616 downloads
File information
File name FULLTEXT01.pdfFile size 604 kBChecksum MD5
57e258e5feb6fc896afdcf2063034fc71f0dad18c0c50d1605e83f320b1e94e19b08eb19
Type fulltextMimetype application/pdf

By organisation
JTH, Industrial Engineering and Management
Production Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar
Total: 2617 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 983 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf