Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Problemanalys vid Aros Quality Group Enclosure Systems AB
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
2006 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 points / 15 hpStudent thesis
Abstract [en]

The aim of this report is to increase the knowledge and understanding of the problems within the production at AQ Enclosure systems, and thereby achieve a more stable flow throughout the whole process, a better working environment and better competition advantages. The internal flow along with the external cooperation is very important for the company, because it views flexibility and short leadtime as it is the most important competitive means. The part of AQ production that’s been investigated is the manufacturing of ATM-machines, where the costumer is Banqit. This company is a rater small company with about 4 % of the world market of ATM-machines.

In order to achieve the aim of the report extensive interviews have been carried out with employees at AQ. Employees in both the administrative part as well as the manufacturing part has been interviewed. The interviews have been conducted in a way were the respondents have had the opportunity to study the questions in advance.

The survey has given a result which indicates problem over a wide scale. A lot of the company problems do not lie in a particular department; they rather include the whole company. The picture of their problems became more complex whereas different respondents look at the same problems in different ways. One big difference in views was clearly identified between office staff and the producing staff. The problems that emerged were not related to lack of machine capability, the problems were rather linked to the managing of production and organization. One example of this problem is the producing personnel’s lack of knowledge and commitment to the company philosophy. The problems concerning management also reflect in a rather strong feeling that divides the company in two, us and them. This feeling affects the whole production line. The producing personnel feels that the office lack understanding of their everyday work and don’t encourage suggestions concerning process evolvement. One other big problem concerning AQ’s production is that some of their key suppliers are either single source or locked from their costumer Banqit.

The conclusions of the report shows several areas in which AQ can improve. One measure that the company can implement is introducing a more foreseeable and visual handling of their pallets within the factory. The company management ought to find ways to better mediate the production philosophy throughout the entire organization. Furthermore, the company management should increase the will to see potential ways of improving and increase the inclination of expressing those suggestions. The suggestions should not only concern the personnel’s own workplace but rather span over the entire process. The report also identifies possible areas of improvement concerning the internal and external team cooperation. The different teams ought to see each other as costumers and produce an equally good result regardless of if the item is produced for an internal department or an external costumer.

Place, publisher, year, edition, pages
2006. , p. 50
Keywords [en]
Supply Chain Management, Lean Production, Just in Time, Kaizen, Kanban
Keywords [sv]
Supply Chain Management, Lean Production, Just in Time, Kaizen, Kanban
National Category
Other Mechanical Engineering
Identifiers
URN: urn:nbn:se:hj:diva-501OAI: oai:DiVA.org:hj-501DiVA, id: diva2:4210
Uppsok
teknik
Supervisors
Examiners
Available from: 2006-08-07 Created: 2006-08-07

Open Access in DiVA

fulltext(1061 kB)930 downloads
File information
File name FULLTEXT01.pdfFile size 1061 kBChecksum MD5
5b1d875637ba4b49717e627058f9bed1f881d7d816e753597b316dad2506395d6373fe6b
Type fulltextMimetype application/pdf

By organisation
JTH, Industrial Engineering and Management
Other Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 942 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 840 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf