Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
GNSS-instrumentets möjligheter och begränsningar vid vägbyggnation
Jönköping University, School of Engineering, JTH, Civil Engineering.
Jönköping University, School of Engineering, JTH, Civil Engineering.
2011 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Possibilities and limitations of the GNSS instrument in road construction (English)
Abstract [sv]

Rapporten syftar till att avgöra om entreprenörernas stora användning av GNSSteknikinom vägbyggnation är berättigad med avseende på ställda toleranskrav.GNSS betyder ”Global Navigation Satellite Systems” och är ett samlingsnamn förde satellitsystem som idag används för att utföra precisionsmätningar.En litteraturstudie har gjorts för att få svar på frågorna om vilka toleranser somgäller för vägutsättning samt vilken noggrannhet de olika mätmetoderna har.Kontakt har tagits med ett antal vägentreprenörer från olika företag som är insattai vägutsättning. De har fått besvara ett antal frågor som reder ut vilkenmetod/utrustning de använder idag samt hur stor kunskapen är om GNSS iblandentreprenörerna. De har dessutom fått svara på vad de anser är för-, respektivenackdelar med användning av GNSS vid vägutsättning.En litteraturstudie av byggtoleranser resulterar i de värden som måste uppnås vidbygget. Dessa jämförs sedan med de noggrannheter som de olika mätmetodernahar enligt en litteraturstudie av dessa.Frågeformulär har skickats ut och sammanställs i rapporten vilket ger en godåterspegling av entreprenörernas åsikter och kunskaper om GNSS samt vad deanvänder sig av idag. Dessutom finns en sammanfattad punktlista med för ochnackdelar som angetts av mätansvariga hos de olika entreprenörerna.En slutsats som kan dras är att den beställare som använder sig av AMAAnläggning 07 vid upprättande av bygghandling också anger toleranskrav i bådeplan och höjd för alla vägens lager.Ska man jämföra mätnoggrannhet med de hjälptoleranser i höjd som beskrivits såär GNSS-tekniken otillräcklig för den noggrannheten som ställs. Dessahjälptoleranser speglar dock inte funktionskraven till fullo utan är bara ett slagshjälpmedel för att räkna ut rimliga utsättningstoleranser.Entreprenörer vittnar om att GNSS-teknik kan användas vid anläggning avsamtliga obundna lager undantaget bärlagerjustering för att uppfylla defunktionskrav som ställs på vägen. Detta verifieras med de efterkontroller somgörs på vägens färdiga lager.De entreprenörer som är vana vid större vägprojekt har även stor kunskap omGNSS-teknik och använder den flitigt.Det finns stora fördelar med användandet av GNSS-tekniken. Smidighet, en godöverblick för maskinföraren och tidsbesparing är några av demMen det finns även vissa nackdelar som dålig kompabilitet mellan olika märken påutrustning, onoggrannheten som inte tillåter att man helt slutar använda annan typav mätutrustning samt att platsansvariga tappar överblicken över bygget.

Abstract [en]

The report aims to determine whether contractors' high use of GNSS technologyin road construction is entitled in respect of subordinated tolerance requirements.GNSS means ”Global Navigation Satellite Systems” and is a collective name forthe satellite systems that today are used to perform precision measurements.A literature study has been done to get answers to questions about the tolerancesthat apply to road stake out and the accuracy of the different measurementmethods.Contact has been made with a number of road contractors from variouscompanies who are familiar with road stake out. They've got to answer a numberof questions that sorts out which method / equipment they use today and howmuch knowledge is on GNSS among contractors. They also answered questionsabout what they believe is for, and disadvantages with the use of GNSS in roadstake out.The literature review of construction tolerances results in the values that must beachieved during the construction. These results are then compared with theaccuracies of different measurement methods, according to the literature review ofthese.A questionnaire was sent out and responses are compiled in the report, they giveus a good reflection of contractors' opinions and knowledge of GNSS and whatthey use today. A bulleted list has been made of pros and cons identified bypersons responsible of measuring among the various contractors.A conclusion to be drawn is that the client that uses the AMA Anläggning 07 inthe preparation of construction document also specifies tolerances of all layers ofthe road, both horizontally and vertically.Shall one compare accuracy of GNSS technology with the help tolerances inheight described in the report; the method is inadequate for the accuracyrequirements. These tolerances are not fully comparable to the performancerequirements; it is only a tool to figure out a reasonable stake out tolerances.Contractors testify that GNSS technology can be used in the construction of allunbound layers except for base course adjustments to meet the functionaldemands on the road.The contractors who are accustomed to major road projects have also greatknowledge of GNSS technology and use it diligently. There are great benefits withthe use of GNSS technology. Agility, a good overview for the machine operatorand time saving are some of them. But there are also some disadvantages such aspoor compatibility between different brands, inaccuracy that does not allow tocompletely stopping using other types of measuring equipment and locationmanagers that loses the overview.

Place, publisher, year, edition, pages
2011. , p. 54
Keywords [sv]
GNSS, byggtoleranser, vägbyggnation, RTK-teknik, maskinstyrning
National Category
Building Technologies Construction Management
Identifiers
URN: urn:nbn:se:hj:diva-15013OAI: oai:DiVA.org:hj-15013DiVA, id: diva2:416800
Subject / course
JTH, Civil Engineering
Uppsok
Technology
Supervisors
Examiners
Available from: 2011-08-02 Created: 2011-05-12 Last updated: 2011-08-02Bibliographically approved

Open Access in DiVA

fulltext(1106 kB)2844 downloads
File information
File name FULLTEXT01.pdfFile size 1106 kBChecksum SHA-512
5f9f65fe2ab4e51a566839cd359a1eec5b247837f4a547bb4ab81f3306ff7e76708a981bdeaf5693a36d8ce1ba402cdb991ac571c322f542df25e3d482472587
Type fulltextMimetype application/pdf

By organisation
JTH, Civil Engineering
Building TechnologiesConstruction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 2844 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 963 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf