Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Studie av materialhantering på Proton Finishing i Forsheda
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
2006 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 points / 15 hpStudent thesisAlternative title
A study in material handling processes on Proton Finishing in Forsheda (English)
Abstract [en]

The aim with this report was to exam and surveys the internal logistics of Proton Finishing’s production. The basic data should give the company suggestions of more efficient and improved internal logistics. We will also give from our perspective suggestions of improvement, which the company will be able to evaluate.

To evaluate these problems we used different kinds of methods. A frequency study was made on the internal forklift. For that we used a predefined sheet where we once a minute registered what it were doing. With a stopwatch we registered how long time the operators spend in the storage. We also did interviews with the personnel to get their opinion on these matters. The study was conducted during a four day period, where these methods were used to study the work in the factory.

The result that emerged are divided after which line/function the personnel worked on. The stopwatch survey showed that the personnel on hang 1 line spend time in the storage which they don’t suppose to do, according to their work assignment. The frequency study showed that the internal forklift spend one and a half hour a day to look after material. The study also showed that only 45 per cent of its work was useful work.

Our conclusions after this report are that a storage software with all it’s components should be used. We have also given suggestion of more efficient material handling around the three lines in the A-sector.

Place, publisher, year, edition, pages
2006. , p. 68
Keywords [sv]
Internlogistik, materialhantering, lager, produktionslogistik, materialflöde, lagerförvaltningssystem, förvaringssystem
National Category
Other Mechanical Engineering
Identifiers
URN: urn:nbn:se:hj:diva-443OAI: oai:DiVA.org:hj-443DiVA, id: diva2:4157
Uppsok
teknik
Supervisors
Examiners
Available from: 2006-06-21 Created: 2006-06-21

Open Access in DiVA

fulltext(1543 kB)1029 downloads
File information
File name FULLTEXT01.pdfFile size 1543 kBChecksum SHA-1
79ffa5321d6893e479851250b71a842c69397b54f3de85664effa8ef53e6e33267acc473
Type fulltextMimetype application/pdf

By organisation
JTH, Industrial Engineering and Management
Other Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 1029 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1081 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf