Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Kartläggning av kapacitetsutnyttjandet och ställtider på Stålöv AB: Survey of the use of capacity and set up times at Stålöv AB
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
2006 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 points / 15 hpStudent thesis
Abstract [en]

The aim of this report is to analyse the use of the capacity at the CNC (computer numerical control) cutters and show how the level of set up time for these cutters at Stålöv AB. This assignment is concrete whereas there are no subjective questions to this matter and there are only cold figures presented.

Production economy is getting more important as the competition hardens and there are several different ways to increase productivity and efficiency in a company. In order to increase productivity and efficiency work studies are used to, through an analysis, find developments in methods that result in improved work methods and to establish the time that are used. Increased production of different parts and customer driven production in combination with increased demands on rationalisation of capital have led to an enlarged interest for shorter set up times in the production.

To point out the use of capacity and the set up time of the cutters at Stålöv AB we used frequency studies. Frequency studies are work measure methods based on random observations on predetermined events to calculate the relative occurrence of these events. The purpose is to present the objective cold figures that show the use of capacity for all machines and totally.

The compilation of the seven CNC cutters shows that the use of capacity reaches 33 %. The lack of machine operators is the single largest reason, 45 % of the total use of capacity. The set up time reaches 6 % totally of the 36 hours of observation of the machines.

The study of the separate CNC cutters shows that the result follows the result of the compilation of all machines; the main reason why the use of capacity is low depends on the lack of machine operators. This means that if the demand increases there will not be enough operators to meet this demand.

If using SMED, the set up time percentage share of the total use of capacity are too large, but the production of prototypes that supplies great value to the company may justify the set up times.

By using Total Productive Maintenance (TPM), based on the elimination of breakdowns and defective products, the stability in production and the use of capacity may increase.

Place, publisher, year, edition, pages
2006. , p. 43
Keywords [en]
Use of capacity, production economy, set up times, work measure methods, frequency studies, Total productive maintenance
Keywords [sv]
Kapacitetsutnyttjande, produktionsekonomi, ställtider, arbetsstudier, frekvensstudier, Totalt produktivt underhåll
National Category
Production Engineering, Human Work Science and Ergonomics
Identifiers
URN: urn:nbn:se:hj:diva-438OAI: oai:DiVA.org:hj-438DiVA, id: diva2:4151
Uppsok
teknik
Supervisors
Examiners
Available from: 2006-06-20 Created: 2006-06-20

Open Access in DiVA

fulltext(354 kB)2173 downloads
File information
File name FULLTEXT01.pdfFile size 354 kBChecksum SHA-1
a0109112d8f7f711a092a97402eace96a6d6d4c07d45bcbd7a1f32b6b8e0bcb82dcad163
Type fulltextMimetype application/pdf

By organisation
JTH, Industrial Engineering and Management
Production Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar
Total: 2173 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1072 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf