Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Flödesanalys hos Anders Karhner AB
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
2006 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 points / 15 hpStudent thesis
Abstract [sv]

Denna rapport har utförts hos Anders Krahner AB i Skillingaryd som ingår i koncernen Proton Group AB. År 2005 omsatte Proton Group 920 mkr med 730 anställda medan Anders Krahner omsatte 160 mkr med 90 anställda. Anders Krahners kunder finns främst inom fordonsindustrin.

Syftet med rapporten är att studera om möjlighet finns att optimera produktionsflödet för två artiklar i befintliga lokaler. Genom att studera vad som påverkar genomloppstiden för artiklarna negativt kunna ge förslag på hur detta kan förbättras. Frågan är om detta kan ske i dagens lokaler eller är nybyggnation enda sättet att effektivisera produktionsflödet. Studien har skett från råvarulager till det att slutartikeln levereras till kund.

All data i rapporten är hämtad ur Anders Krahners MPS system och baseras på ett års underlag. Ur dessa data har genomsnittstiderna för processtider och lagertider beräknats. Likaså har de planerade tiderna för operationerna erhållits ur MPS systemet. För att få förståelse för materialflödet i produktionen har layoutflödesscheman skapats. Genom analys av dessa har de totala interntransportsträckorna beräknats.

I resultatet framgår det att de planerade operationstiderna stämmer väl överens med de verkliga tiderna. Detta visar på att operationerna fungerar väl ur ett tidsperspektiv, dock finns det vissa kvalitetsbrister. Det som påverkar genomloppstiden mest i negativ riktning är tiden för råvaru- och mellanlager. Ytterligare en bidragande orsak till den långa genomloppstiden är de komplicerade interntransporterna. Vidare orsaker till den komplexa interntransporten är att närhet mellan olika operationsmoment saknas idag. En del av de operationer som utförs för att färdigställa artiklarna sker på legoproduktion. Dessa tillverkningsmoment skapar en del av de komplicerade interntransporterna.

För att skapa närhet mellan de olika operationerna har nya layouter skapats i den befintliga lokalen. En del av de operationer som sker på outsourcing har tagits hem för att ske i egen regi. Detta för att erhålla större kontroll över det totala flödet och öka kvalitén. Den skillnad som uppstår mellan layouterna i den befintliga lokalen jämfört med ny anses vara små då det finns potential i den nuvarande.

Abstract [en]

This report has been performed at Anders Krahner AB in Skillingaryd which is a part of Proton Group AB. Year 2005 Proton Group had a turnover of 920 smkr with 730 employees while Anders Krahners turnover was 160 smkr with 90 employees. Anders Krahners customers are mostly within the automobile industry.

The aim of this report is to study the possibility to optimize the production flow for two articles in the existing premises. By studying the factors that have a negative impact on the throughput time give proposal of how this can overcome. The question is if this can be done in existing premises or if a new premise is required. The study has been made from raw material stock until the delivery of the end product to the customer.

All the facts have been required from Anders Krahners MPS system and are based on one year’s basis. The average time for the processes and the stock has been calculated from this data. The planed times for the operations has also been collected from their MPS system. To gain an understanding for the production a layout flowchart has been made. Throughout analysis of these the total internal transport stretch has been calculated.

It is shown in the result that the planed operation times equal the actual operation times quite well. This interpret that the operations works well out of a time perspective, but there is a lack of quality at the products. A thing that influences the throughput time negative is the time for raw material- and middle material stock. More reasons to the complex internal transport today are the lack of nearness between operations. A part of the operations that are made in the process in completing the articles are made external. These operations create some of the complicated internal logistics.

To create the wanted nearness between the operations new layouts have been created in the existing premises. Some of the operations that are made external before have been suggested to be made in house. Due to this a greater control over the entire flow is received and higher product quality. The main difference between the suggested layout in the existing premises and a new one is considered to be small.

Place, publisher, year, edition, pages
2006. , p. 53
Keywords [en]
Throughput time, process mapping, production layout, flow analysis, internal logistic, stock
Keywords [sv]
Genomloppstid, processkartläggning, produktionslayout, flödesanalys, internlogistik, lager
National Category
Production Engineering, Human Work Science and Ergonomics
Identifiers
URN: urn:nbn:se:hj:diva-409OAI: oai:DiVA.org:hj-409DiVA, id: diva2:4120
Uppsok
teknik
Supervisors
Examiners
Available from: 2006-06-14 Created: 2006-06-14

Open Access in DiVA

fulltext(1909 kB)3024 downloads
File information
File name FULLTEXT01.pdfFile size 1909 kBChecksum MD5
370ca3c5a2f25d7575de5b88504e7b4eaa3f95887e29ac7ae99966b9d7a733b04ae2fd73
Type fulltextMimetype application/pdf

By organisation
JTH, Industrial Engineering and Management
Production Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar
Total: 3024 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 2055 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf