Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
IAS Water project in Sudan
Jönköping University, School of Engineering, JTH, Civil Engineering.
2007 (English)Independent thesis Basic level (degree of Bachelor), 10 points / 15 hpStudent thesis
Abstract [en]

Northern Bahr el Ghazal area in southwestern part of Sudan was severely affected by the civil wars in Sudan. This has led to lacks of development in most areas, not least water supply. In combination with a high number of refugees returning to the area the water situation is very difficult.

This study is made to investigate how the water project of International Aid Services (IAS) is working. First I wanted to get a good image of the different areas connected to the IAS water project such as community mobilization, drilling and water source and sanitation education.

At the time of my studies the Community Mobilization Unit (CMU) had just began their work, therefore the system with Water Source and Sanitation Committees had not yet been really implemented. However, some had been formed but not trained.

The drilling is performed using two different methods, Mud Rotary and Air Flush. Mud Rotary is used in clay soil and Air Flush is used in more rocky soil.

One of the main problem issues is transport, mainly transport of drilling machines, well material and water used during drilling. Problems in the means of transport are the terrible conditions of the roads which also lead to terrible conditions of the vehicles, especially the heavy vehicles which are very old.

Another main problem is supplies, especially supplies of spares for the vehicles and equipment but also food and other essentials. Many things have to be brought from other countries via Khartoum and then by lorry to Northern Bahr el Ghazal.

One of my conclusions is that much weight must be put on the county community mobilization to really involve the local people in the project so that they feel responsible for the well after it has been handed over. This is crucial to get full impact of the project.

Another conclusion is that if supplies could be handled through Southern Sudan (Juba) it could cut down transport time and costs. But this cannot be realized yet since the range of things in Juba is rather limited compared to Khartoum.

Finally I believe that the personnel must be very observant for coming breakdowns and report this immediately to enable ordering spares, etc. as soon as possible and minimize the time standing still.

Place, publisher, year, edition, pages
2007. , p. 44
Keywords [sv]
Vattenprojekt, vattenförsörjning, brunnsborrning, brunnar, Sudan, vatten, bistånd, NGO, hjälporganisation
National Category
Building Technologies
Identifiers
URN: urn:nbn:se:hj:diva-1021OAI: oai:DiVA.org:hj-1021DiVA, id: diva2:3453
Uppsok
teknik
Supervisors
Available from: 2007-11-06 Created: 2007-11-06

Open Access in DiVA

fulltext(652 kB)3084 downloads
File information
File name FULLTEXT01.pdfFile size 652 kBChecksum MD5
5c6b0af9df76a7b0c01158454178e0ee283a67d5181a9df66bf3fb250f348e493a0f0b67
Type fulltextMimetype application/pdf

By organisation
JTH, Civil Engineering
Building Technologies

Search outside of DiVA

GoogleGoogle Scholar
Total: 3100 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 660 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf