Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Managing production ramp-up: Requirement on strategy content
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management. Jönköping University, School of Engineering, JTH. Research area Industrial Engineering and Management.
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management. Jönköping University, School of Engineering, JTH. Research area Industrial Engineering and Management.ORCID iD: 0000-0002-0216-4493
2006 (English)Conference paper, Oral presentation only (Other academic)
Abstract [en]

To compete as a manufacturer in today’s environment, with severe competition an rapidly decreasing product life cycles, the ability to manage production ramp-up successfully has become a vital issue. It’s evident when reviewing previous research that knowledge and skills about how to manage a production ramp-up often is lacking. Consequently this means a lack of comprehensiveness which often results in inferior ramp-up management. The intention when managing a production ramp-up strategy is to facilitate decisions that lead to best possible usage of time, financial means and resources when trying to meet preset ramp-up performance targets. In order to accomplish this some sort of production ramp-up management framework needs to be in place. In this paper a proposal for a production ramp-up management framework is suggested. This framework is meant to be a support when deciding upon a new, existing or a combination of production ramp-up strategies to carry out a production ramp-up. The framework suggests that the changes needed in the manufacturing strategy content, critical factors affecting the production ramp-up and previous production ramp-up evaluation should guide when choosing production ramp-up strategy.

Place, publisher, year, edition, pages
2006.
Keywords [en]
production ramp-up management, strategy content, production ramp-up strategy
National Category
Engineering and Technology
Identifiers
URN: urn:nbn:se:hj:diva-2557OAI: oai:DiVA.org:hj-2557DiVA, id: diva2:33377
Conference
POMS International 2006, Shanghai, China.
Available from: 2007-08-02 Created: 2007-08-02 Last updated: 2015-09-29Bibliographically approved

Open Access in DiVA

No full text in DiVA

Authority records BETA

Berg, MagnusSäfsten, Kristina

Search in DiVA

By author/editor
Berg, MagnusSäfsten, Kristina
By organisation
JTH, Industrial Engineering and ManagementJTH. Research area Industrial Engineering and Management
Engineering and Technology

Search outside of DiVA

GoogleGoogle Scholar

urn-nbn

Altmetric score

urn-nbn
Total: 794 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf