Planned maintenance
A system upgrade is planned for 24/9-2024, at 12:00-14:00. During this time DiVA will be unavailable.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Manufacturing engineering requirements in the early stages of new product development — A case study in two assembly plants
School of Innovation, Design and Engineering, Mälardalen University, Eskilstuna, Sweden.
School of Innovation, Design and Engineering, Mälardalen University, Eskilstuna, Sweden.ORCID iD: 0000-0001-7935-8811
Jönköping University, School of Engineering, JTH, Supply Chain and Operations Management. Jönköping University, School of Engineering, JTH, Industrial Product Development, Production and Design. School of Innovation, Design and Engineering, Mälardalen University, Eskilstuna, Sweden.ORCID iD: 0000-0001-9800-4840
School of Innovation, Design and Engineering, Mälardalen University, Eskilstuna, Sweden.
2019 (English)In: Advanced applications in manufacturing engineering / [ed] M. Ram & J. P. Davim, Elsevier, 2019, p. 141-167Chapter in book (Refereed)
Abstract [en]

The interface between the product development function and the manufacturing function is one key dimension in new product development (NPD) projects. Hard and soft requirements for manufacturability are defined and communicated to product development teams early in the NPD project to ensure the new products are fit for the manufacturing system. In this chapter, we determined what requirements are important for a manufacturing system and how these requirements are handled during an NPD project by analyzing two industrial cases. The results showed that requirements communicated from the manufacturing function to the design function had different sources and effects on different aspects of the manufacturing system. They were communicated and integrated to various degrees and through various mechanisms. There was a tendency to rely on the personal and verbal communication of requirements, as opposed to using more formal structured methods. This way of working was sufficient when product change was incremental and not radical. The case studies showed that the manufacturing function needed to employ more efficient methods to define and communicate their requirements in large and complex NPD projects.

Place, publisher, year, edition, pages
Elsevier, 2019. p. 141-167
Keywords [en]
new product development, manufacturing requirements, case study, concurrent engineering
National Category
Production Engineering, Human Work Science and Ergonomics
Research subject
Production Engineering
Identifiers
URN: urn:nbn:se:hj:diva-44777DOI: 10.1016/B978-0-08-102414-0.00005-7ISI: 000472707700006ISBN: 978-0-08-102414-0 (print)OAI: oai:DiVA.org:hj-44777DiVA, id: diva2:1329051
Available from: 2018-11-23 Created: 2019-06-24 Last updated: 2019-12-14Bibliographically approved

Open Access in DiVA

No full text in DiVA

Other links

Publisher's full text

Authority records

Wiktorsson, MagnusRösiö, Carin

Search in DiVA

By author/editor
Wiktorsson, MagnusRösiö, Carin
By organisation
JTH, Supply Chain and Operations ManagementJTH, Industrial Product Development, Production and Design
Production Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar

doi
isbn
urn-nbn

Altmetric score

doi
isbn
urn-nbn
Total: 205 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf