Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Förbättrad leveransprecision med Building Information Modeling: Med fokus på materialleveranser till nybyggnationer
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
Jönköping University, School of Engineering.
2018 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Abstract [sv]

Syfte – Syftet med studien är att undersöka hur BIM kan användas för att förbättra leveransprecisionen av materialleveranser till byggarbetsplatsen gällande nybyggnationer. För att besvara studiens syfte har två frågeställningar formulerats. Första frågeställningen utgör en grund för att sedan kunna besvara andra frågeställningen.

- Vilka faktorer påverkar leveransprecisionen av materialleveranser till byggarbetsplatsen? - Hur kan leveransprecisionen av materialleveranser till byggarbetsplatsen förbättras med hjälp av BIM?

Metod – För att uppnå studiens syfte och frågeställningar genomfördes en fallstudie i form av intervju och dokumentstudie på två olika företag inom byggindustrin. En litteraturstudie genomfördes med syfte att forma det teoretiska ramverket som sedan varit en grund för att besvara studiens syfte och frågeställningar.

Resultat – Studien har identifierat faktorer som påverkar leveransprecisionen av materialleveranser till byggarbetsplatsen och kategoriserat in dem i två huvudfaktorer, samordning och planering. För ett effektivare arbete i byggprocessen är BIM ett verktyg som bland annat underlättar samordning och planering. Detta kan resultera i att leveransprecisionen av materialleveranser till byggarbetsplatsen kan förbättras med hjälp av BIM.

Implikationer – Studien utgår från befintliga teorier som sedan jämförs med verkligheten. Studien belyser ingen ny teori men illustrerar nya synvinklar till ett redan befintligt problem. Svårigheten har varit i att hitta teorier om hur BIM kan påverka leveransprecisionen av materialleveranser. Teorier har därför tolkats och analyserats för att hitta möjliga förbättringar.

Begränsningar – Studien omfattar leveransprecisionen av materialleveranser till nybyggnationer och tar enbart hänsyn till leveransprecisionen från leverantören till byggarbetsplatsen. Inom BIM omfattar studien 3D- och 4D BIM och utesluter 5D- och 6D BIM.

Abstract [en]

Purpose – The purpose of the study is to investigate how BIM can improve the ontime delivery of material to construction sites for new constructions. To answer the purpose of the study, two research questions have been formulated.

- Which factors effect on-time delivery of material to the construction site? - How can on-time delivery of material to the construction site be improved by using BIM?

Method – In order to achieve the purpose and research questions of the study, a case study was conducted at two different companies in the construction industry. The empirical data from the case study were collected through interviews and document studies. A literature study was conducted with the purpose of formulating the theoretical framework that subsequently been used to answer the purpose and research questions.

Findings – The study has identified factors that effect on-time delivery of material to the construction site and categorized them into two main factors, coordination and planning. BIM is a tool, among other thing, for a more efficient work in the construction process that facilitates coordination and planning. Using BIM can result in that on-time delivery of material to the construction site can be improved.

Implications – The study is based on existing theories that compares to reality. The study does not develop new theory, but it illustrates new perspectives on an already existing problem. It has been difficult to find theories about how BIM may effect ontime delivery of materials. Theories have therefore been interpreted and analysed to find possible improvements.

Limitations – The study covers the on-time delivery of materials to new constructions. The study also covers the on-time delivery from supplier to the construction site. Within BIM, the study covers 3D- and 4D BIM and excludes 5D- and 6D BIM. 

Place, publisher, year, edition, pages
2018.
Keywords [en]
Building information modeling, supply chain management, just in time, on-time delivery, material delivery
Keywords [sv]
Leveransprecision, materialleverans
National Category
Construction Management
Identifiers
URN: urn:nbn:se:hj:diva-41523ISRN: JU-JTH-IGA-1-20180090OAI: oai:DiVA.org:hj-41523DiVA, id: diva2:1249908
External cooperation
Företagen vill vara anonyma
Subject / course
JTH, Civil Engineering
Supervisors
Examiners
Available from: 2018-09-21 Created: 2018-09-20 Last updated: 2018-09-21Bibliographically approved

Open Access in DiVA

fulltext(992 kB)73 downloads
File information
File name FULLTEXT01.pdfFile size 992 kBChecksum SHA-512
f1eb9a73e83ec70c62346edd3f72b20f0d51a71e97915c19f249f266e854ed8c4e6c1f804d82375c9beac647f9585c2a3e630b73e8bfeeccd4906605537b59fc
Type fulltextMimetype application/pdf

By organisation
JTH, Industrial Engineering and ManagementSchool of Engineering
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 73 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 656 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf