Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
BIM inom kalkyl
Jönköping University, School of Engineering, JTH, Civil Engineering.
Jönköping University, School of Engineering, JTH, Civil Engineering.
2018 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
BIM within calculation (English)
Abstract [sv]

Sammanfattning

Syfte: Det främsta problemet med implementering av BIM inom kalkyl är brister och felaktigheter i 3D-modeller (tredimensionell modell) som medför att de inte blir pålitliga. Målet med detta arbete är därför att klargöra hur informationskvalitén i en BIM-modell kan förbättras för att därmed öka användningen av BIM inom kalkyl hos byggföretag.

Metod: Intervjuer, observationsstudier och litteraturstudier är de metoder som har valts för att besvara frågeställningarna i rapporten. Intervjuer utfördes med företag som har implementerat BIM inom kalkyl, med sådana som inte har infört och med företag som håller på att införa det. Observationsstudier genomfördes med handledarföretaget där kalkylprocessen redovisades tydligt. Litteraturstudier har pågått under hela arbetets gång för att ha en teoretisk grund i det hela. Informationen från dessa tre metoder har sedan jämförts för att därefter dra rimliga slutsatser.

Resultat: En vägledning för branschen som lösning till kvalitetsproblem i modeller är att upprätta manualer. Dessa ska användas vid skapandet av modeller vilket troligtvis ska medföra reducering av felaktigheter. Dock krävs det även erfarenhet och kompetens inom personal samt investeringar på kostnad- och tid.

Konsekvenser: Skulle implementering av BIM inom kalkyl lyckas medför det att säkrare kalkyler kan utföras vilket stärker företagets konkurrenskraft. Genom att implementera detta så tidigt som möjligt kan företagen utvecklas och undvika att hamna efter i branschen. Detta gynnar både företaget och den nya tekniken samtidigt som stora tids och kostnadsbesparingar erhålls. En implementering som denna kan lyckas vid upprättning av manualer med tydliga kravspecifikationer som tillämpas vid modellskapandet. Detta med hjälp av rätt erfarenheter och kompetenser bland involverad personal.

Begränsningar: De begränsningar som finns i resultaten är bland annat att entreprenadformer och ansvarsförhållanden inte inkluderas. Dessutom är det avgränsat till att enbart behandla BIM i tidiga kalkylskeden vilket därmed medför att BIM inom planering, produktion, förvaltning och övriga skeden utesluts.

Nyckelord: BIM, 5D, fördelar, kostnader, manualer.

Abstract [en]

Abstract

Purpose: The main problem with implementation of BIM within calculation is the weaknesses and inaccuracies in 3D-models that makes them unreliable. The aim of this work is therefore to clarify how the information quality in a BIM model can be improved to thereby increase the use of BIM within calculation of construction companies.

Method: Interviews, observation studies and literature studies are the chosen methods to answer the questions in the report. Interviews were conducted with companies that have implemented BIM within calculation, with those who have not introduced it yet, and with those who are about to implement it. Observation studies were conducted with the supervisor company where the calculation process was clearly reported. Literature studies have been done throughout the course to have a theoretical knowledge of the whole. The information from these three methods has then been compared to therefore make good conclusions.

Findings: A guidance to the industry as a solution to quality problems in models is to set up manuals. These will be used during the creation of the models which will probably lead to a reduction of errors. However, it also requires experience and skills in staff as well as investments on cost and time.

Implications: If the implementation of BIM within calculation succeeds, it will be possible to make safer calculations that strengthen the company's competitiveness. By implementing this as early as possible, companies can develop and avoid falling behind in the industry. This benefits both the company and the new technology while achieving great time and cost savings. An implementation like this can be successful in establishing manuals with clear requirement specifications which are applied during the creation of a model. This can be done with right experience and skills in the involved staff.

Limitations: The limitations in the results are among other things, the fact that construction contracts and allocation of responsibilities are not included. In addition, it is limited to treat BIM in early calculation phases, which means that BIM in planning, production, management and other stages are excluded. 

Keywords: BIM, 5D, benefits, costs, manuals.

Place, publisher, year, edition, pages
2018. , p. 31
Keywords [en]
BIM, 5D, benefits, costs, manuals
Keywords [sv]
BIM, 5D, fördelar, kostnader, manualer
National Category
Architectural Engineering Construction Management Building Technologies
Identifiers
URN: urn:nbn:se:hj:diva-40799ISRN: JU-JTH-BTA-1-20180212OAI: oai:DiVA.org:hj-40799DiVA, id: diva2:1223762
External cooperation
NCC Sverige AB
Subject / course
JTH, Civil Engineering
Supervisors
Examiners
Available from: 2018-07-17 Created: 2018-06-26 Last updated: 2018-07-17Bibliographically approved

Open Access in DiVA

fulltext(2198 kB)6 downloads
File information
File name FULLTEXT01.pdfFile size 2198 kBChecksum SHA-512
d2af029341c3f3a97f9f2defc875ac20b5d150a1cf8f9912bd62934a645eda37ac002f3d76120b68e4868d3fbb622c0a1fc4de0378c57003d53a9f6244d2c5cb
Type fulltextMimetype application/pdf

By organisation
JTH, Civil Engineering
Architectural EngineeringConstruction ManagementBuilding Technologies

Search outside of DiVA

GoogleGoogle Scholar
Total: 6 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 17 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf