Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
BIM I TOTALENTREPRENAD: PROJEKTERINGENS INFORMATIONSLEVERANSER FÖR PRODUKTIONENS GRUNDLÄGGNING
Jönköping University, School of Engineering, JTH, Civil Engineeering and Lighting Science.
2017 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
BIM IN A DESIGN-BUILD CONTRACT: THE INFORMATION DELIVERIES OF THE DESIGN PROCESS FOR THE FOUNDATION WORK OF THE PRODUCTION (English)
Abstract [sv]

Syfte: Byggsektorn karaktäriseras av att till stor del bestå av temporära projektorganisationer med mycket samarbete mellan discipliner men utan någon vidare processkontinuitet mellan de unika projekten. Det finns ett stort fokus på tid och omedelbar handling som en del av aktörernas referensram och varje aktivitet och nytt arbetssätt bör ge omedelbara fördelar i form av tidsvinster och effektivare utförande för att villigt accepteras.

Behoven av standardiserade arbetssätt blir mycket synliga när man börjar införa BIM i projekten. Att aktivt använda BIM-modellen på bygget skapar krav på innehållet och att man följer ett projekteringsschema. BuildingSMART International (2010) skriver: ”Om den nödvändiga informationen är tillgänglig när den behövs och kvalitén på informationen är tillfredställande, så blir själva byggprocessen signifikant förbättrad”. Målet med detta examensarbete är att ta fram ett förslag på hur sekvensen av informationsleveranser bör se ut för den inledande produktionen av bärande system i en totalentreprenad.

Metod: För att nå målet har en litteraturstudie genomförts för att skapa arbetets teoretiska ramverk. En fallstudie på en totalentreprenad med djupgrundläggning har genomförts. I fallstudien har empiri insamlats genom intervjuer med några av projektets aktörer samt en dokumentanalys av relevanta ritningar, protokoll och övriga dokument i projektet.

Resultat: Rapporten har kartlagt sekvensen av informationsleveranser (inklusive vilket informationsinnehåll och vilken detaljeringsnivå de behöver ha) för den inledande produktionen av bärande system i en totalentreprenad. Detta kunskapsbidrag med processkarta och informationsbehov kan byggas vidare på, för att kunna implementeras i BIM-verktygen och därigenom underlätta arbetet och föra BIM-användningen framåt.

Konsekvenser: Rapporten har med ovan resultat bidragit med några påbörjade pusselbitar i ett stort pussel av information och leveranser i rätt sekvens och detaljeringsgrad. För att pusslet ska bli komplett måste även informationsleveranser från förfrågningsunderlaget fungera korrekt. Arbetet har belyst fördelar att arbeta med BIM i denna del av byggprocessen. Rapporten föreslår förtydligande av innebörd genom att ha både detaljeringsnivå och utvecklingsnivå som benämningar i Sverige.

Begränsningar: Rapporten begränsas till att beskriva vad byggentreprenören behöver för informationsleveranser från konstruktören som rör pålning, grundsulor och fundament. Rapporten beskriver också de informationsleveranser konstruktören behöver för att uppfylla byggentreprenörens informationsbehov.

Abstract [en]

Purpose: The building industry is characterised by mainly consisting of temporary project organizations with much interdisciplinary cooperation but with little continuity of process between the unique projects. There is a big focus on time and immediate action as part of the actors’ frame of reference, and every activity and new work method should give immediate advantages in time savings and more efficient work to be readily accepted.

The need for standardised work methods is very visible when BIM is introduced in the projects. To actively use the BIM-model on site creates demands on the content and that a design schedule is followed. BuildingSMART International (2010) writes: ”If the information required is available when it is needed and the quality of information is satisfactory, the construction process will itself be significantly improved”. The aim of this work is to produce a suggestion of how the sequence of information deliveries should be in the starting production of the loadbearing system in a design build project.

Method: To reach the aim a literature study has been conducted to create the theoretical framework for the study. A case study has been conducted on a design build project with a deep foundation. Empirical data has been collected by means of interviewing some of the project actors and conducting a document analysis of project documents such as drawings and protocols.

Findings: The report has mapped the sequence of information deliveries (including what information content and what level of development they need to have) for the initial production of the loadbearing system in a design build project. This contribution of knowledge with the process map and information demands can be built upon, to allow for implementation in the BIM tools and thus make the work easier and push the use of BIM forward.

Implications: With the above results the report has contributed with a few started puzzle pieces in a big puzzle of information and deliveries in the correct sequence and level of development. To complete the puzzle the information deliveries from the specifications also needs to work correctly. The report has shown advantages by working with BIM in this part of the building process. The report suggests clarification of meaning by using both names, level of detail and level of development, in Sweden.

Limitations: The report is limited to describe what information deliveries the contractor needs from the structural designer when it comes to piling and foundations. It also describes the information deliveries needed by the structural designer to be able to meet the information need of the contractor.

Place, publisher, year, edition, pages
2017.
Keyword [en]
BIM, building information modelling, process mapping, IDM, information delivery, LOD, level of detail, level of development
Keyword [sv]
BIM, Byggnadsinformationsmodellering, processkartläggning, IDM, informationsleverans, LOD, detaljeringsnivå, utvecklingsnivå
National Category
Building Technologies Construction Management
Identifiers
URN: urn:nbn:se:hj:diva-35189ISRN: JU-JTH-BTA-1-20170136OAI: oai:DiVA.org:hj-35189DiVA: diva2:1080932
External cooperation
Lindqvist Byggkonsult AB
Subject / course
JTH, Civil Engineering
Supervisors
Examiners
Available from: 2017-03-14 Created: 2017-03-12 Last updated: 2017-03-14Bibliographically approved

Open Access in DiVA

fulltext(2505 kB)75 downloads
File information
File name FULLTEXT01.pdfFile size 2505 kBChecksum SHA-512
34890a4bff244516d5ff0bbfa4f59048f3451fdd6721c4d19a3404300408d5bd0a13d544d67a9b5410407a78410c12cb271b906941f5eb7ecbfa22d314c70163
Type fulltextMimetype application/pdf

By organisation
JTH, Civil Engineeering and Lighting Science
Building TechnologiesConstruction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 75 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

Total: 195 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf