Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Krav och hinder med kalkylering i BIM
Jönköping University, School of Engineering, JTH, Civil Engineering.
Jönköping University, School of Engineering, JTH, Civil Engineering.
2015 (Swedish)Independent thesis Basic level (university diploma), 10 credits / 15 HE creditsStudent thesisAlternative title
Requirements and obstacles with calculation in BIM (English)
Abstract [sv]

Syfte: BIM ger möjligheter till att utföra byggprojekt på ett effektivare sätt, genom att dela framtagen information mellan aktörer genom projektets alla delar. Denna rapport går igenom de krav och hinder som finns för att utföra effektiva BIM-kalkyleringar samt skillnader mellan dessa och traditionella kalkyleringar.

Metod: Studien har besvarats genom intervjuer med projektörer och entreprenörer som arbetar med BIM i sin verksamhet, samt litteraturstudier av tidigare gjorda räkneexempel. Insamlad empiri har sedan jämförts med ett teoretiskt ramverk som skapats genom litteraturstudie av tidigare forskningsarbete inom ämnet.

Resultat: I dagsläget finns det flera problem som måste lösas för att BIM- kalkyleringar ska bli effektiva. Det första problemet är osäkerheten kring det juridiska ansvaret, vem som är ansvarig och när. Det andra problemet är att BIM-modellerna inte uppfyller den kvalité som krävs för att ska den ska vara kalkylerbar. Det tredje är avsaknaden av en standardisering och gemensamt språk för BIM-modellen inom branschen.

Konsekvenser: Det största problemet vid BIM-kalkyleringar är att BIM-modellen inte uppfyller kvalitetskravet som ställs på modellerna, detta kan delvis avlägsnas genom kommunikation mellan entreprenör och projektör vid en totalentreprenad eller att byggherren beställer en kalkylerbar BIM-modell av projektören vid en utförandeentreprenad. Utöver detta måste en standardisering utformas som den som finns för 2D-ritningar. Det juridiska ansvaret måste ses över, för att projektören ska känna sig säker att lämna ifrån sig BIM-modeller, varpå entreprenören ska kunna lita på levererade BIM-modeller.

Begränsningar: Arbetet har begränsats till att fokusera på nybyggnation. 

Abstract [en]

Purpose: BIM provides opportunities to perform projects more efficiently, by sharing information between designers, engineers and contractors. This report examines the requirements and the obstacles to perfume effective calculation within BIM. Differences between calculation within BIM and the traditional way are also examined.

Method: The study has been answered through interviews with architects, structural engineers and contractors that work with BIM. A study of literature has also been used to get information from previous studies and examples of calculations. Collected empirical data were compared with a theoretical framework created by studies of previous research on the subject.

Findings: In the current situation, there are several problems that must be solved in order to be able to do effective e calculation within BIM. The first problem is the uncertainty surrounding the legal responsibility, regarding who is responsible for the BIM model in certain situations. The second problem is that the BIM model does not meet the required quality to be calculable. The third problem is the lack of standardization and a common language of the BIM models within the industry.

Implications: The main problem with calculations within in BIM is that, the BIM model does not meet the requirement of quality imposed on the model. This can partially be removed by communication between designers, engineers and contractors at a turnkey, or that the client orders a calculable BIM model from the designer. The legal responsibility must be reviewed in order to make projectors feel safe to deliver BIM models to the contractors, which the contractors need to have reliability on.

Limitations: The work has been limited to focusing on new construction.

Place, publisher, year, edition, pages
2015. , p. 50
Keywords [sv]
BIM, kalkylering, kostnadsestimering, mängdavtagning, mängdberäkning, krav, hinder, 4D, 5D
National Category
Construction Management
Identifiers
URN: urn:nbn:se:hj:diva-28534ISRN: JU-JTH-BTA-1-20150046OAI: oai:DiVA.org:hj-28534DiVA, id: diva2:878683
External cooperation
Blue Wall AB
Subject / course
JTH, Civil Engineering
Supervisors
Examiners
Available from: 2015-12-16 Created: 2015-12-09 Last updated: 2015-12-16Bibliographically approved

Open Access in DiVA

fulltext(1833 kB)751 downloads
File information
File name FULLTEXT01.pdfFile size 1833 kBChecksum SHA-512
dd5c9aba445fd19c3424651b953b48dc22511547bf2792f0be6df16a8436a264a5eaf2ba806fcea0855400c92202ccdfaccd5eedb9ba36bba635e0f1c00032e1
Type fulltextMimetype application/pdf

By organisation
JTH, Civil Engineering
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 751 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 1023 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf