Svårigheter som konsulter upplever vid lean-projektering inom byggbranschen
Jönköping University, School of Engineering.
Jönköping University, School of Engineering.
2019 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Sustainable development
Sustainable Development
Alternative title
Difficulties experienced by consultants during lean design in the construction industry (English)
Abstract [sv]

Syfte: Syftet med denna rapport är att identifiera varför det är problematiskt för konsulter att arbeta med lean processer och ta reda på vad konsekvenserna av detta kan bli. Slutligen ska rapporten knyta ihop säcken och behandla frågan om hur det går att gå tillväga för att effektivare involvera konsulter i sitt arbete med lean och få det effektiva flöde som lean i grunden strävar efter.

Metod: Metoden som har använts för att få fram resultat i denna studie är litteraturstudier samt semistrukturerade intervjuer av olika konsulter och uppdragsgivare.

Resultat: Arbetets resultat har landat i att det är viktigt med en bra projektledning som trycker för att lean ska eftersträvas och följas, visuell styrning ska användas som hjälpmedel och för kortare avstämningar och den personliga kontakten mellan de involverade i projektet är avgörande. Allt detta ska varvas med en god mötesstruktur för att ständigt hålla alla uppdaterade.

Konsekvenser: Att konsulter inte följer sagda lean processor vid beställning av entreprenör, leder till att konsulten arbetar på sitt eget sätt och kan således resultera i problem i senare skede mellan andra konsulter och/eller entreprenören. Fler organisationer väljer att arbeta efter ett lean-tänk och implementeringen av detta hade både förenklat och effektiviserat projekteringsskedet och samarbetet mellan entreprenörer och konsulter om det hade funnits mer underlag för hur arbetet kan förbättras.

Begränsningar: Studien är begränsad till AF Bygg Göteborg, som själva anställer sina konsulter. Den är avgränsad till relationen mellan uppdragsgivare och konsulter samt konsulter sinsemellan. Studien kommer inte att studera effekterna av lean för företaget. Studien kommer heller inte att gå in på allmänna bestämmelser eller olika upphandlingsformer.

Nyckelord: Lean, konsult, lean construction, the Toyota Way, Jidoka, konsulter och projektledning.

Abstract [en]

Purpose: The aim of this report is to identify why consultants find it difficult to work with lean based projects and to find out the consequences of not following this philosophy. This report will discuss how it would be possible to more effectively involve consultants in their work with lean and maintain the effective flow that the lean philosophy strives for.

Method: The methods used to achieve the results needed for this study are articles, books, scientific articles and semi-structured interviews with different consultants and taskmasters.

Findings: The results of the study have shown that it is important to have a strong project management which really pushes for lean to be maintained and pursued. Visual steering is also something that should be pursued in order for consultants to more easily manage the lean idea. Some results have also shown that the personal connection between people working together in a project is of importance in order to maintain good communication. Finally, a good meeting structure, is maybe the most important part to make a lean philosophy work.

Implications: The fact that consultants do not follow the said lean processor when ordering the contractor leads to the consultant working in their own way and can thus result in problems at a later stage between other consultants and / or the contractor. More organizations choose to work according to a lean and the implementation of this had both simplified and streamlined the design phase and the collaboration between contractors and consultants if there had been more basis for how the work could be improved.

Limitations: The study is limited to AF Bygg Göteborg who themselves have hired all the consultants that the interviews were conducted with. It is also limited to the relation between the taskmasters and the consultants but also the consultants among themselves. The study will not study the effects of lean for this specific company. It will also not touch on general regulations nor different forms of procurements.

Keywords: Lean, consultant, lean construction, the Toyota Way, Jidoka, consultants and project managment.

Place, publisher, year, edition, pages
2019. , p. 37
Keywords [sv]
Lean, konsult, lean construction, the toyota way, jidoka, konsulter, projektledning, projektledare
National Category
Construction Management Architectural Engineering Building Technologies
Identifiers
URN: urn:nbn:se:hj:diva-46216ISRN: JU-JTH-BTA-1-20190313OAI: oai:DiVA.org:hj-46216DiVA, id: diva2:1352034
External cooperation
AF Bygg Göteborg
Subject / course
JTH, Civil Engineering
Presentation
2019-05-22, JTH - E1418, Gjuterigatan 5, 553 18, Jönköping, 16:00 (Swedish)
Supervisors
Examiners
Available from: 2019-11-06 Created: 2019-09-17 Last updated: 2019-11-06Bibliographically approved

Open Access in DiVA

Svårigheter som konsulter upplever vid lean-projektering inom byggbranschen(718 kB)1 downloads
File information
File name FULLTEXT01.pdfFile size 718 kBChecksum SHA-512
e071d0e9850837f198e615293d079077bc5eaed21452c14e9f56d453b3305da3ed9e69bd7941896b4b7a1ea797f84d454199d6ec334442f2a3d4fe844448f94d
Type fulltextMimetype application/pdf

By organisation
School of Engineering
Construction ManagementArchitectural EngineeringBuilding Technologies

Search outside of DiVA

GoogleGoogle Scholar
Total: 1 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 10 hits
910111213141512 of 40
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf