Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Informationsflöde inom prefabprocessen: Hur kan Derome Träteknik effektivisera informationsflödet från konstruktion till produktion?
Jönköping University.
Jönköping University.
2018 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Information flow at an off-site fabrication : How can Derome Träteknik make the information flow from design-stage to production more effective? (English)
Abstract [sv]

Syftet med studien är att undersöka hur informationsflödet på en prefabriceringsfabrik fungerar, från konstruktion till produktion. Mer konkret inriktar den sig till att identifiera effektiva och ineffektiva steg i flödet samt förbättringsmöjligheter för att kunna optimera personalens dagliga arbete.

Eftersom ingen tidigare kunskap kring var problemen inom informationsflödet på fallföretaget fanns, kunde inte någon teoretiskt koppling formuleras innan fallstudien var genomförd. Fallstudien utgjordes av metoderna observation och intervju där kvalitativ data insamlades. Observationen genomfördes för att kartlägga processen av informationsflödet på fallföretaget. Intervjuerna genomfördes för att få de anställdas åsikter och hitta vart problemen låg. Efter fallstudien kunde teoriområdena klargöras och en litteraturstudie utfördes.

De problemområden som framgick utifrån undersökningen grundar sig främst i tidsbrist. Detta bland annat på grund av tidskrävande aktiviteter som manuell hantering vid uppförandet av tillverkningsritningar och revideringar i fallföretagets planeringar. Förbättringsförslaget författarna presenterar är därmed en uppgradering av ritprogram samt implementering av ett planeringssystem. Tidsbristen ansågs även leda till brister inom kommunikationen. Författarna anser att det, av olika skäl, är viktigt att behålla den personliga kontakten och komplettera denna med system.

Studien ämnar sig till att bidra med kunskap kring hur ett informationsflöde på en prefabriceringsfabrik kan vara utformat. Den stärker teorier kring varför det är viktigt att behålla den fysiska kommunikationen när uppdaterade system implementeras. Den har vidare bidragit med förslag kring vilka delar som kan effektiviseras inom ett informationsflöde där prefabelement tillverkas.

Arbetet begränsades till att enbart genomföras på en prefabriceringsfabrik och kollar bara på flödet mellan konstruktion till produktion. Inga ekonomiska aspekter har beaktats och endast ett företag har deltagit i undersökningen.

Abstract [en]

The study aimed to investigate how the information flow at an off-site fabrication is working, from design-stage to production. More specifically, it focus on identifying effective and ineffective parts in the information flow, along with improvement opportunities to optimize the personnel’s daily work.

Since the authors had no knowledge about where the problems in the information flow at the company was, they were not able to create a theoretical framework before the case study was made. The case study involved observation and interviews. The observation was made to identify the process and information flow at the company. The interviews were made to get the knowledge about the personnel’s opinion and to locate where the problems in the information flow occurred. With the case study as a base the theoretical framework could be made with a literature study.

The problem areas that emerged from the case study are all mainly based from the lack of time. This is partly due to the time-consuming activities such as manual handling in the making of production technical drawing and revision of planning documents. The improvement proposal the authors present is to upgrade the computer-aided design software and to implement a planning system. The authors also consider the lack of time as a reason for shortcomings in the communication. The improvement proposal the authors present for this is to keep the personal contact and to supplement it with a system.

The study intends to contribute with knowledge about how an information flow at an off-site fabrication may look like. It reinforces theories about why it is important to keep the personal communication when a system upgrade are implemented. The study has also contributed in proposals in which parts of the information flow that have potential to become more effective at an off-site fabrication.

The study was limited to an off-site fabrication and only the information flow between design-stage and production was included in the study. No economic aspects were considered and only one company has participated in the study.

Place, publisher, year, edition, pages
2018. , p. 54
Keywords [en]
Prefabrication, off-site construction, information flow, communication, digitizing, efficiency
Keywords [sv]
Prefab, informationsflöde, kommunikation, digitalisering, effektivisering
National Category
Construction Management
Identifiers
URN: urn:nbn:se:hj:diva-41782ISRN: JU-JTH-IGA-1-20180101OAI: oai:DiVA.org:hj-41782DiVA, id: diva2:1253929
External cooperation
Derome Träteknik
Subject / course
JTH, Industrial Engineering and Management; JTH, Civil Engineering
Available from: 2018-10-08 Created: 2018-10-08 Last updated: 2018-10-08Bibliographically approved

Open Access in DiVA

Informationsflöde inom prefabprocessen(2114 kB)52 downloads
File information
File name FULLTEXT01.pdfFile size 2114 kBChecksum SHA-512
7946c60bbfecdbb410bbf5b1eebbb9bd688ed683edbf60fb0102953f955462ef98bdcfbcecc3277f95a5f5ddeba32787d0036a8f5dee8d443b5decc3f39f156f
Type fulltextMimetype application/pdf

By organisation
Jönköping University
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 52 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 301 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf