Ökat värdeskapande arbete: Implementering av 5S på en byggarbetsplats
Jönköping University, School of Engineering, JTH, Civil Engineeering and Lighting Science.
Jönköping University, School of Engineering, JTH, Civil Engineeering and Lighting Science.
2018 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Value creating work : Implementation of 5S on a construction site (English)
Abstract [sv]

Syfte: Forskning visar att byggbranschen inte utvecklas i den takt den borde göra sett till produktiviteten. I försök att öka det värdeskapande arbetet försöker företag att implementera metoder som 5S för att minimera slöseri. Små och medelstora företag (SME-företag) besitter inte samma kompetens och resurser som större företag och därmed försvåras effektiviseringen av produktionsprocessen. Förändringsarbeten av människors vanor samt företagskulturer är en svår process som grundar sig på djupt rotade roller och strukturer.

Denna rapports syfte är att introducera Lean genom implementering av 5S på en byggarbetsplats. Målet är sedan att utforma en rekommendationsmanual för hur implementering av Lean-verktyget 5S kan gå tillväga i byggproduktionsskedet.

Metod: De valda metoderna för datainsamling är litteraturstudie, fokusgruppsintervjuer och deltagande observationer. Med hjälp av litteraturstudien har kunskap erhållits. Fokusgruppsintervjuerna har bidragit till att genomföra en nulägesanalys, samt utvärdera implementeringen av 5S på arbetsplatsen. Deltagande observationer har använts för att studera utvecklingen på arbetsplatsen. Dessa metoder har legat till grund för att besvara och uppfylla rapportens syfte, mål och frågeställningar.

Resultat: Resultatet av den genomförda studien mynnade ut i framtagandet av en rekommendationsmanual för hur 5S kan implementeras i byggproduktionsskedet. Därigenom har kritiska faktorer identifierats och förslag på hur företag kan gå tillväga med implementeringen av 5S.

Konsekvenser: Slutsatser som dragits utifrån studien är att förändringsprocesser är svåra att genomföra. Ansvaret för att öka produktiviteten och minimera slöseri bör inte enbart ligga hos de större entreprenörerna. Alla aktörer inom byggbranschen måste samarbeta mot ett gemensamt mål för att förbättra byggprocessen och minska kostnaderna. Lean och 5S kan vara lösningen på problemen. På grund av bristande resurser och kunskap kan därför företag behöva extern hjälp med implementeringen. Redan vid projekteringen av ett byggprojekt är det viktigt att tänka på planeringen för att förhindra slöseri. Innan ett företag genomför en förändring av organisationen är det viktigt att ledningen engagerar sig och förstår Lean för att motivera personalen. Vidare krävs ständiga förbättringar och problemlösning för att engagera personalen.

Begränsningar: Studien avgränsades till att fokusera på införandet av 5S och därigenom introducera Lean och dess koncept med förbättringsarbete och problemlösning. Resultatet av implementeringen blev lyckad i detta fall men resultatet kan variera då varje fall är unikt.

Abstract [en]

Purpose: Studies shows that the construction industry doesn’t develop in the pace that it should regarding productivity. To increase the value creating work companies tries to implement methods as 5S to minimize waste. Small and medium size enterprises (SME) lack the competence and resources that larger companies have and thereby the efficiency of the production process is more difficult. Change management of human’s habits and business culture is a complicated process which is based on deeply rooted roles and structures.

The purpose of this report is to introduce Lean by implementing 5S at a construction site. The goal is then to design a recommendations manual for how implementation of the Lean-tool 5S can be done in the construction phase.  

Method: The chosen methods for collecting data is literature study, focus group interviews and participatory observations. With help from the literature study knowledge has been gathered. The focus group interviews have contributed with performing zero-state analysis and evaluating the implementation of 5S on the working site. Participatory observations have been used to study the development on the working site. These methods contributed to answering and fulfilling the purpose, goal and the issues of this report. 

Results: Results from the study has ended up with the development of a recommendations manual for how 5S can be implemented in the construction phase. Thereby critical factors have been identified and suggestions for how companies can proceed implementation of 5S. 

Consequences: Conclusions that have been made from the study is that processes of change are hard to do. The responsibility to increase the productivity and minimize waste should not solely lie with the larger entrepreneurs. Every actor within the construction business must work toward a common goal to improve the construction process and reduce costs.  Lean and 5S can be the solution to these problems. Due to lack of resources and knowledge companies may need external help when it comes to the implementation. Already in the design of a construction project it’s important to think about the planning to prevent waste. Before a company makes a change of the organization it’s important that the management is committed and understands Lean to be able to motivate the staff. Further it’s necessary that continuous improvements and problem-solving is done to engage the staff.

Limitations: The study was limited to focusing on the implementation of 5S and thereby introduce Lean and its concept with improvement work and problem-solving. The result of the implementation was a success in this case, but the result can vary from every case since they all are unique.

Place, publisher, year, edition, pages
2018. , p. 76
Keywords [en]
5S, Lean, SME, practical implementation, recommendation manual 5S
Keywords [sv]
5S, Lean, SME-företag, praktisk implementering, rekommendationsmanual 5S
National Category
Construction Management
Identifiers
URN: urn:nbn:se:hj:diva-40979ISRN: JU-JTH-BTA-1-20180232OAI: oai:DiVA.org:hj-40979DiVA, id: diva2:1232175
External cooperation
Peab Sverige AB
Subject / course
JTH, Civil Engineering
Supervisors
Examiners
Available from: 2018-08-24 Created: 2018-07-10 Last updated: 2018-08-24Bibliographically approved

Open Access in DiVA

Ökat värdeskapande arbete - Implementering av 5S på en byggarbetsplats(1949 kB)118 downloads
File information
File name FULLTEXT01.pdfFile size 1949 kBChecksum SHA-512
cf2bd3697fab533965de49b4f11fe2703cbb53cf714dc06446ae068f80953641cce40c69fa6c40d509fa14de3d9574fc1f2a94286ae9d4c7e9845348d3f93258
Type fulltextMimetype application/pdf

By organisation
JTH, Civil Engineeering and Lighting Science
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 118 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 595 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf