Ändra sökning
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Adapting the lead time tree model to include immaterial activities: Extending the lead time tree model to enable mapping, efficiency evaluation and waste identification in order fulfillment processes
Högskolan i Jönköping, Tekniska Högskolan, JTH, Industriell produktutveckling, produktion och design, JTH, Produktionsutveckling.
2019 (Engelska)Självständigt arbete på avancerad nivå (masterexamen), 20 poäng / 30 hpStudentuppsats (Examensarbete)
Abstract [en]

Much research regarding efficiency in manufacturing industry has historically been focused on the material activities of the shop floor. However, companies that merely focus on material activities when trying to improve lead times, risk losing potential for improvements within immaterial activities such as planning, engineering, design, and purchasing, which often constitute the most time consuming parts of the order fulfillment processes. Engineer to order (ETO) products are particularly time consuming regarding their immaterial activities, and the customer is waiting for the products from the very beginning of the order fulfillment process. Shortening the lead time to customer for ETO products is therefore important for customer satisfaction.

The aim of this study is to adapt an existing lead time tree model currently focused on material activities to also include immaterial activities, enabling a full visualization of all activities contained in order fulfillment processes. The lead time tree model would thereby be able to use as a tool when working on shortening the lead time to customer. A further aim of the study is to investigate how the adapted lead time tree model can be used in further areas as well, in addition to visualizing immaterial activities.

The adaption of the lead time tree model has been based on the original literary source of the lead time tree model. The original lead time tree model has been analyzed towards theoretical data from a literature study, and towards empirical data about immaterial activities in order fulfillment processes for ETO products, from the case company Kongsberg Maritime Sweden AB (previously Rolls-Royce AB). The result of this has been an adapted lead time tree model that can visualize immaterial activities.

Several adaptions of the original lead time tree model have been made for it to be able to visualize immaterial activities, while still keeping the basics of the original model. The adapted lead time tree model comprises information that is normally kept separated and that is important when planning and improving a process. Additional information that is needed for each specific case can also easily be included in the lead time tree. The adapted lead time tree model has proven to have additional areas of use within project planning, improvement work regarding lead time reduction and root-cause analysis, and as a boundary object for communication between internal actors and between internal and external actors.

The adapted lead time tree model is presumably able to map and visualize immaterial activities in other fields of business as well, other than manufacturing, as the nature of immaterial activities remains the same across business environments.

Ort, förlag, år, upplaga, sidor
2019. , s. 34
Nyckelord [en]
Administrative processes, Boundary object, Critical path, Engineer to order, Information flow mapping, Process mapping, Time-phased product structure
Nationell ämneskategori
Teknik och teknologier
Identifikatorer
URN: urn:nbn:se:hj:diva-43766ISRN: JU-JTH-PRS-2-20190053OAI: oai:DiVA.org:hj-43766DiVA, id: diva2:1319147
Externt samarbete
Kongsberg Maritime Sweden AB; Rolls-Royce AB
Ämne / kurs
JTH, Produktionssystem
Handledare
Examinatorer
Tillgänglig från: 2019-06-20 Skapad: 2019-05-29 Senast uppdaterad: 2019-06-20Bibliografiskt granskad

Open Access i DiVA

Jonsson Egeman (2019) Adapting the Lead Time Tree Model to Include Immaterial Activities(860 kB)23 nedladdningar
Filinformation
Filnamn FULLTEXT01.pdfFilstorlek 860 kBChecksumma SHA-512
2c2a707d75f1bde572964e27383366e56973d75023a51f4516839fee4e22217a673152baf781e5e4945438aada71f270626a1f98f3e005e910b97332daa9c76d
Typ fulltextMimetyp application/pdf

Av organisationen
JTH, Produktionsutveckling
Teknik och teknologier

Sök vidare utanför DiVA

GoogleGoogle Scholar
Totalt: 23 nedladdningar
Antalet nedladdningar är summan av nedladdningar för alla fulltexter. Det kan inkludera t.ex tidigare versioner som nu inte längre är tillgängliga.

urn-nbn

Altmetricpoäng

urn-nbn
Totalt: 84 träffar
RefereraExporteraLänk till posten
Permanent länk

Direktlänk
Referera
Referensformat
  • apa
  • harvard1
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annat format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annat språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf