Improving efficiency in material supply to assembly line: A case study in the automotive industry in Southeast Asia
2015 (engelsk)Independent thesis Basic level (university diploma), 10 poäng / 15 hp
OppgaveAlternativ tittel
Effektivisering av materialförsörjningen till monteringslina : En fallstudie i fordonsindustrin i Sydostasien. (svensk)
Abstract [en]
Purpose – The purpose of the thesis was to improve the material supply for assembly line.
Methodology - The collected data were conducted through observations and measurements at the case company. Empirical data were analyzed and compared with the theoretical framework.
Result - Several non-value adding activities were identified in the case study that resulted in 88% of the total working effort. These non-value adding activities were classified into wastes referring to Liker and Meier (2006). Six different wastes were found: excess inventory, unnecessary transportation, unnecessary movements, defected products, waiting, unused and neglected resources. Improvement recommendations were proposed to increase the efficiency of the material supply.
Conclusions – There is at least one improvement proposal for every identified waste and combinations of these improvement proposals can reduce the non-value adding activities. Methods that can be useful to improve the material supply efficiency are change storage policy, reduce batch size, route plan milk-runs, implement standard work procedures and develop and integrate the information system. 5S and Kaizen are proposed theories that promote continuous improvements of the material supply.
Research Limitations – Since there are many factors affecting the material supply, more improvement proposals could have been found without delimitation of activities. This thesis is based on a single case study which leads to generalizable results for only companies with similar circumstances.
Further Research – By implementing the conducted improvement proposals a comparison of non-value adding activities is possible to strengthen the presented methods.Key Words – Material Supply, Lean production, Non-Value Adding Activities, Wastes, Efficiency Improvements.
sted, utgiver, år, opplag, sider
2015. , s. 58
HSV kategori
Identifikatorer
URN: urn:nbn:se:hj:diva-28205ISRN: JU-JTH-IGA-1-20150016OAI: oai:DiVA.org:hj-28205DiVA, id: diva2:862383
Eksternt samarbeid
Volvo Group Trucks Thailand
Fag / kurs
JTH, Industrial Engineering and Management
Veileder
Examiner
2015-10-302015-10-212015-10-30bibliografisk kontrollert