Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Identifikation av produktionsstörningar och obalanser vid tillverkning av golvskenor
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
2006 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 points / 15 hpStudent thesis
Abstract [en]

Our report procedure identification of instability and disturbance in an automatic manufacturing line of processing and assembling of chair sliding rails at Sapas manufacturing department in Vetlanda.

To obtain a stabile ground we have mapped the material flow to receive a comprehensive view and to visualise connections.

We have examined cycle times at different stations in purpose to identificate bottlenecks. The result of our examination showed that the bottleneck of the line was the brush station. This leads to that the expected bottlenecks identificated by Sapa gets a delay time and by that a longer cycle time.

Interruptions has a clear negative influence at the line performance so we have also assemble data through the operators report list and compiled these in order to find out the interruptions effect on the line. The outcome during our assembled period was that the reported interruptions corresponded about 30 percent of the total available production time. This has a clear negative effect on the line productivity and efficiency as we have calculated in order to get the present status.

Place, publisher, year, edition, pages
2006. , p. 33
Keywords [sv]
Automatiserad produktionslina, bearbetning, cykeltid, materialflöde, montering, produktionsstörningar
National Category
Production Engineering, Human Work Science and Ergonomics
Identifiers
URN: urn:nbn:se:hj:diva-408OAI: oai:DiVA.org:hj-408DiVA, id: diva2:4119
Uppsok
teknik
Supervisors
Examiners
Available from: 2006-06-14 Created: 2006-06-14

Open Access in DiVA

fulltext(497 kB)1730 downloads
File information
File name FULLTEXT01.pdfFile size 497 kBChecksum SHA-1
3c4c0bdcf2d59ff5a22d24b11945196f3418d791a9906724a526788988073adb4939b3cd
Type fulltextMimetype application/pdf

By organisation
JTH, Industrial Engineering and Management
Production Engineering, Human Work Science and Ergonomics

Search outside of DiVA

GoogleGoogle Scholar
Total: 1730 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 710 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf